When PJM runs their regulation tests, how long do the rests normally run?
Give this one a try later!
40 minutes
If you have three 150 MW generators with each having an economic minimum of 50
MW and an emergency minimum of 20 MW, what would be the total Emergency
Reducible amount you would report to PJM?
Give this one a try later!
90 MW (Economic Minimum - Emergency Minimum x # of units)
,When PJM sends out a cost signal to generators to adjust their output, the generating
personnel adjust the output of the unit based on the units
Give this one a try later!
Price or cost curve incremental
What toool is used by PJM operators for providing verbal alerts to PJM Transmission
and Generation dispatchers?
Give this one a try later!
All-Call
Possible Triggers for Conservative Operations:
Give this one a try later!
- Fuel Delivery Issues
- Forrest or Brush Fires
- Environmental Alerts
- Bad Weather
- Geomagnetic Disturbances (GMD)
- Terrorist or Sabotage threats against the BES
- PJM entering (as NERC defines it) an "Unknown Operating State"
The primary purpose for the balancing area to have Regulation is to correct for
,Give this one a try later!
Small deviations in load
When does PJM issue an EEA Level 3?
Give this one a try later!
Manual Load Dump Action
If a company has a regulation obligation, which of the following is NOT an option to
satify their obligation?
Give this one a try later!
Purchase the regulation form a generator outside of PJM balancing area
Your system experienced an event that caused the frequency to drop below 60.00
Hz, what would be the most likely event that occurred?
Give this one a try later!
A generator on your system tripped off-line
Imminent Threat Alert
, Give this one a try later!
Warns of a credible, specific and impending threat against the U.S.
According to PJM requirements, which of the following is not required by PJM in
providing adequate and reliable telecommunications?
Give this one a try later!
Dispatch radio systems
What is monitored for Geomagnetic disturbances?
Give this one a try later!
- Thermocouples
- Vibration
- Sound
- Voltages/Currents
Dynamic Reserve for Hydro?
Give this one a try later!
15%
Give this one a try later!
40 minutes
If you have three 150 MW generators with each having an economic minimum of 50
MW and an emergency minimum of 20 MW, what would be the total Emergency
Reducible amount you would report to PJM?
Give this one a try later!
90 MW (Economic Minimum - Emergency Minimum x # of units)
,When PJM sends out a cost signal to generators to adjust their output, the generating
personnel adjust the output of the unit based on the units
Give this one a try later!
Price or cost curve incremental
What toool is used by PJM operators for providing verbal alerts to PJM Transmission
and Generation dispatchers?
Give this one a try later!
All-Call
Possible Triggers for Conservative Operations:
Give this one a try later!
- Fuel Delivery Issues
- Forrest or Brush Fires
- Environmental Alerts
- Bad Weather
- Geomagnetic Disturbances (GMD)
- Terrorist or Sabotage threats against the BES
- PJM entering (as NERC defines it) an "Unknown Operating State"
The primary purpose for the balancing area to have Regulation is to correct for
,Give this one a try later!
Small deviations in load
When does PJM issue an EEA Level 3?
Give this one a try later!
Manual Load Dump Action
If a company has a regulation obligation, which of the following is NOT an option to
satify their obligation?
Give this one a try later!
Purchase the regulation form a generator outside of PJM balancing area
Your system experienced an event that caused the frequency to drop below 60.00
Hz, what would be the most likely event that occurred?
Give this one a try later!
A generator on your system tripped off-line
Imminent Threat Alert
, Give this one a try later!
Warns of a credible, specific and impending threat against the U.S.
According to PJM requirements, which of the following is not required by PJM in
providing adequate and reliable telecommunications?
Give this one a try later!
Dispatch radio systems
What is monitored for Geomagnetic disturbances?
Give this one a try later!
- Thermocouples
- Vibration
- Sound
- Voltages/Currents
Dynamic Reserve for Hydro?
Give this one a try later!
15%