Examen

NYC DCAS Construction Project Manager Exam 6040 Prep 2026 | 200 Practice Questions with Correct Answers & Detailed Rationales | Complete Q&A Study Guide

Document preview thumbnail
Vista previa 4 fuera de 49 páginas

Prepare for the NYC DCAS Construction Project Manager Exam No. 6040 with this comprehensive 200-question practice resource featuring correct answers and detailed rationales. Designed for candidates reviewing the knowledge, abilities, and construction-management tasks identified in the official DCAS examination notice. The official DCAS Notice of Examination identifies Exam No. 6040 as an open-competitive Construction Project Manager examination. The multiple-choice test was expected to begin August 17, 2026, and candidates must achieve at least 70% to pass. The official examination covers seven major task areas: resolving construction-related problems, planning construction, overseeing construction and assuring compliance, performing construction cost estimates, directing construction, inspecting construction, and managing project close-out. KEY TOPICS COVERED Construction project planning and management Resolving construction-related problems Construction scheduling and coordination Construction techniques and methods Construction materials and equipment Construction safety practices OSHA laws and regulations NYC Building Code and applicable regulations Accessible design and building practices Construction contracts and contract administration Plans, specifications, and technical documents Cost estimating and job-related mathematics Contractor payments and requisitions Change orders and field-condition changes Project inspections and quality control Contractor and subcontractor oversight Compliance with contract specifications Site safety and insurance requirements Environmental hazards Construction documentation and record keeping Report writing and written comprehension Personnel and material resource management Teamwork and project coordination Construction project close-out Professional and ethical conduct Scenario-based construction management questions The official DCAS notice specifically states that the examination may test construction techniques, materials, equipment, safety, OSHA requirements, NYC Building Code provisions, contracts, plans, specifications, payments, change orders, scheduling, mathematics, report writing, record keeping, environmental hazards, and ethical conduct200 practice questions: Provides an extensive question bank for self-testing and review. Correct answers with rationales: Helps you understand the reasoning behind each answer and identify knowledge gaps. Exam No. 6040 focused: Built around the subject areas and abilities identified in the current NYC DCAS examination notice. Construction-focused preparation: Reviews project planning, cost estimating, inspections, contracts, safety, compliance, and close-out. Practical scenario review: Helps candidates practice applying construction-management principles to workplace situations. Mathematics practice: Supports review of calculations involving construction projects, percentages, quantities, and costs. Technical-document practice: Useful for reviewing plans, specifications, reports, contracts, and written information. Resource-management preparation: Covers personnel, materials, equipment, scheduling, and contractor coordination. Flexible study tool: Suitable for structured study sessions, practice testing, and final review. The official DCAS notice also identifies Material Resources Management, Number Facility, Personnel Resource Management, Teamwork, and Written Comprehension among the abilities that may be assessed..

Vista previa del contenido

,NYC DCAS Construction Project Manager Exam | 200
Questions and Verified Answers | Complete Q&A Guide with
Rationales | A+ Graded
This comprehensive study guide contains 200 practice questions with verified answers and detailed
rationales for the NYC DCAS Construction Project Manager Exam (Exam Nos. 3042, 5058 & 6040). The
content is organized by the core exam domains and reflects the 2026/2027 examination cycle.



SECTION 1: PROJECT MANAGEMENT FUNDAMENTALS

1. Which of the following best defines the primary responsibility of a construction project manager
according to NYC DCAS job specifications?
A. Performing physical construction work on job sites
B. Supervising union negotiations and labor relations
C. Planning, coordinating, and controlling the project from start to finish
D. Approving architectural designs and engineering drawings

Correct Answer: C
Rationale: The project manager oversees planning, coordination, scheduling, budgeting, and execution
to ensure project objectives are met. This includes coordinating activities between agencies,
contractors, and departments responsible for project completion.

2. Which document formally authorizes a construction project and defines its scope, objectives, and
participants?
A. Change order
B. Request for Information (RFI)
C. Project charter
D. Daily construction log

Correct Answer: C
Rationale: The project charter formally authorizes the project and outlines the scope, goals, and
stakeholder roles. It serves as the foundational document that establishes the project's existence and
provides the project manager with authority to proceed.

3. What is the purpose of a project baseline in construction management?
A. To record labor attendance
B. To measure environmental compliance
C. To serve as the approved plan for scope, schedule, and cost against which project performance is
measured
D. To establish site safety protocols

Correct Answer: C
Rationale: A project baseline provides a reference for monitoring and controlling project performance in

,terms of scope, time, and cost. The baseline serves as the approved version of scope, schedule, and cost
used for tracking.

4. Which project delivery method gives the owner a single point of responsibility for both design and
construction?
A. Design-Bid-Build
B. Construction Management at Risk
C. Design-Build
D. Integrated Project Delivery

Correct Answer: C
Rationale: In Design-Build, the owner contracts with a single entity responsible for both design and
construction, reducing risk and coordination issues. Design-Bid-Build involves separate contracts for
design and construction.

5. The "triple constraint" (or iron triangle) of project management refers to the interdependent
relationship among which three factors?
A. Design, permitting, and demolition
B. Scope, schedule (time), and cost
C. Labor, materials, and equipment
D. Owner, architect, and contractor

Correct Answer: B
Rationale: The triple constraint describes how scope, time, and cost are interrelated: a change to any
one of the three typically affects the other two. Project managers must balance these constraints while
maintaining the required quality.

6. Which of the following is NOT a phase of the project management life cycle?
A. Initiation
B. Planning
C. Execution
D. Termination

Correct Answer: D
Rationale: The standard project management life cycle includes Initiation, Planning, Execution,
Monitoring & Controlling, and Closing. "Termination" is not a standard phase name; "Closing" is the
correct term.

7. What does the acronym "WBS" stand for in project management?
A. Work Breakdown Structure
B. Work Budget Schedule
C. Work Build Sequence
D. Work Baseline System

Correct Answer: A
Rationale: WBS stands for Work Breakdown Structure, a hierarchical decomposition of the total scope
of work into manageable components.

, 8. What is the primary purpose of a Work Breakdown Structure (WBS)?
A. To organize and define the total scope of the project
B. To estimate the project budget
C. To schedule project activities
D. To assign team members to tasks

Correct Answer: A
Rationale: The WBS decomposes the project into smaller, manageable components, helping to organize
and define the total scope of work.

9. Which of the following is a key component of project scope management?
A. Scope creep prevention
B. Budget allocation
C. Staff scheduling
D. Material procurement

Correct Answer: A
Rationale: Scope management includes defining, controlling, and preventing unauthorized changes to
the project scope (scope creep).

10. What is the difference between a "milestone" and a "task" in project scheduling?
A. A milestone has a duration; a task does not
B. A milestone is a significant event with zero duration; a task has duration
C. There is no difference
D. Milestones are always at the end of a project

Correct Answer: B
Rationale: A milestone represents a significant point or event in the project with zero duration, while a
task is an activity that consumes time and resources.

11. What is a "constructability review"?
A. To review the design for ease of construction and identify potential problems
B. To review the project budget
C. To review the project schedule
D. To review the safety plan

Correct Answer: A
Rationale: A constructability review evaluates the design to ensure it can be built efficiently, identifying
potential construction issues before they occur.

12. Which of the following is a key component of project quality management?
A. Quality planning, quality assurance, and quality control
B. Cost control only
C. Schedule control only
D. Risk management only

Información del documento

Subido en
26 de septiembre de 2026
Número de páginas
49
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$21.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
itsjustel
3.2
(5)
Vendido
47
Seguidores
1
Artículos
858
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes