SECTION 1: PROJECT MANAGEMENT FUNDAMENTALS
1. Which of the following best defines the primary responsibility of a construction project manager
according to NYC DCAS job specifications?
A. Performing physical construction work on job sites
B. Supervising union negotiations and labor relations
C. Planning, coordinating, and controlling the project from start to finish
D. Approving architectural designs and engineering drawings
Correct Answer: C
Rationale: The project manager oversees planning, coordination, scheduling, budgeting, and execution
to ensure project objectives are met. This includes coordinating activities between agencies,
contractors, and departments responsible for project completion.
2. Which document formally authorizes a construction project and defines its scope, objectives, and
participants?
A. Change order
B. Request for Information (RFI)
C. Project charter
D. Daily construction log
Correct Answer: C
Rationale: The project charter formally authorizes the project and outlines the scope, goals, and
stakeholder roles. It serves as the foundational document that establishes the project's existence and
provides the project manager with authority to proceed.
3. What is the purpose of a project baseline in construction management?
A. To record labor attendance
B. To measure environmental compliance
C. To serve as the approved plan for scope, schedule, and cost against which project performance is
measured
D. To establish site safety protocols
Correct Answer: C
Rationale: A project baseline provides a reference for monitoring and controlling project performance in
,terms of scope, time, and cost. The baseline serves as the approved version of scope, schedule, and cost
used for tracking.
4. Which project delivery method gives the owner a single point of responsibility for both design and
construction?
A. Design-Bid-Build
B. Construction Management at Risk
C. Design-Build
D. Integrated Project Delivery
Correct Answer: C
Rationale: In Design-Build, the owner contracts with a single entity responsible for both design and
construction, reducing risk and coordination issues. Design-Bid-Build involves separate contracts for
design and construction.
5. The "triple constraint" (or iron triangle) of project management refers to the interdependent
relationship among which three factors?
A. Design, permitting, and demolition
B. Scope, schedule (time), and cost
C. Labor, materials, and equipment
D. Owner, architect, and contractor
Correct Answer: B
Rationale: The triple constraint describes how scope, time, and cost are interrelated: a change to any
one of the three typically affects the other two. Project managers must balance these constraints while
maintaining the required quality.
6. Which of the following is NOT a phase of the project management life cycle?
A. Initiation
B. Planning
C. Execution
D. Termination
Correct Answer: D
Rationale: The standard project management life cycle includes Initiation, Planning, Execution,
Monitoring & Controlling, and Closing. "Termination" is not a standard phase name; "Closing" is the
correct term.
7. What does the acronym "WBS" stand for in project management?
A. Work Breakdown Structure
B. Work Budget Schedule
C. Work Build Sequence
D. Work Baseline System
Correct Answer: A
Rationale: WBS stands for Work Breakdown Structure, a hierarchical decomposition of the total scope
of work into manageable components.
, 8. What is the primary purpose of a Work Breakdown Structure (WBS)?
A. To organize and define the total scope of the project
B. To estimate the project budget
C. To schedule project activities
D. To assign team members to tasks
Correct Answer: A
Rationale: The WBS decomposes the project into smaller, manageable components, helping to organize
and define the total scope of work.
9. Which of the following is a key component of project scope management?
A. Scope creep prevention
B. Budget allocation
C. Staff scheduling
D. Material procurement
Correct Answer: A
Rationale: Scope management includes defining, controlling, and preventing unauthorized changes to
the project scope (scope creep).
10. What is the difference between a "milestone" and a "task" in project scheduling?
A. A milestone has a duration; a task does not
B. A milestone is a significant event with zero duration; a task has duration
C. There is no difference
D. Milestones are always at the end of a project
Correct Answer: B
Rationale: A milestone represents a significant point or event in the project with zero duration, while a
task is an activity that consumes time and resources.
11. What is a "constructability review"?
A. To review the design for ease of construction and identify potential problems
B. To review the project budget
C. To review the project schedule
D. To review the safety plan
Correct Answer: A
Rationale: A constructability review evaluates the design to ensure it can be built efficiently, identifying
potential construction issues before they occur.
12. Which of the following is a key component of project quality management?
A. Quality planning, quality assurance, and quality control
B. Cost control only
C. Schedule control only
D. Risk management only