ACI CONCRETE FLATWORK FINISHING
CERTIFICATION FULLY SOLVED TEST PAPER
GRADED A+
◉ Where can you find the time that the concrete was loaded.
Answer: Truck drivers batch ticket
◉ Average Production Rate for a- walk behind power trowel.
Answer: 1000-3000 ft^2 daily
◉ Average Production Rate for a Ride on Trowel.
Answer: 3000-6000 ft^2 daily
◉ Average Production Rate for a Laser guided wheel mounted
screed.
Answer: 30,000-50,000 ft^2 daily
◉ This person is the decision maker and is on site at all times, 12-14
hour days for them are common.
Answer: Finishing Foreman
◉ Who attends the Concrete Preconstruction Conference.
, Answer: Producer
Contractor
GC
Testing lab and inspectors
architect
engineer
owner
◉ Type 1 cement.
Answer: Normal, ordinary use
◉ Type 2 Cement.
Answer: moderate sulfate resistance
◉ Type 3 Cement.
Answer: High Early Strength
◉ Type 4 Cement.
Answer: Low Heat of Hydration
◉ Type 5 Cement.
Answer: high sulfate resistance
CERTIFICATION FULLY SOLVED TEST PAPER
GRADED A+
◉ Where can you find the time that the concrete was loaded.
Answer: Truck drivers batch ticket
◉ Average Production Rate for a- walk behind power trowel.
Answer: 1000-3000 ft^2 daily
◉ Average Production Rate for a Ride on Trowel.
Answer: 3000-6000 ft^2 daily
◉ Average Production Rate for a Laser guided wheel mounted
screed.
Answer: 30,000-50,000 ft^2 daily
◉ This person is the decision maker and is on site at all times, 12-14
hour days for them are common.
Answer: Finishing Foreman
◉ Who attends the Concrete Preconstruction Conference.
, Answer: Producer
Contractor
GC
Testing lab and inspectors
architect
engineer
owner
◉ Type 1 cement.
Answer: Normal, ordinary use
◉ Type 2 Cement.
Answer: moderate sulfate resistance
◉ Type 3 Cement.
Answer: High Early Strength
◉ Type 4 Cement.
Answer: Low Heat of Hydration
◉ Type 5 Cement.
Answer: high sulfate resistance