• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 19 páginas
Examen

CMGT 4300 Test 1 -Questions with Correct Answers

Document preview thumbnail
Vista previa 3 fuera de 19 páginas

CMGT 4300 Test 1 -Questions with Correct Answers

Vista previa del contenido

CMGT 4300 Test 1 -Questions with Correct
Answers
Mesopotamian era builders were responsible for maintaining the quality of

buildings and were given __ ____ __________ punishment if any of their

construction collapsed and their occupants were killed.

death penalty

Examples of ___________&____________ can be found in the Bible dating from at

least 500 BC.

Inspections & Specifications

Walter Shewhart introduced ______ to the process and his concept was that quality

is not relevant to the finished product but to the _____ that created the product.

Statistical process control & Process

Kerzner says that emphasis is being placed on strategic quality management such

as:

Quality has become a:

Quality is linked with:

Quality is defined by the:

Competitive weapon

profitability

customer

,The history of quality includes multiple distinct eras which are:

1.

2.

3.

4.

inspection

control

assurance

total quality

Total Quality Management has three (3) elements which are:

Total:

Quality:

Management:

organization wide

customer satisfaction

systems of managing

The American Society for Quality (ASQ) defines quality as:

characteristics of a product or service that bear its ability to satisfy stated or implied

needs & free of deficiencies

Edward Deming's definition of quality is:

, quality should be designed into both product & process.

Quality is primarily the responsibility of the:

contractor

According to Chung: construction project quality is the fulfillment of the owner's

needs which are:

defined scope, budget, specified schedule

Most construction projects specify that all the contracted works are subject to

inspection by the:

owner, consultant, owner's representatives

According to Chung, some major functions of quality control for the production of

ready mixed concrete and fabrication of precast units are:

1.

2.

3.

control of raw materials

process monitoring

testing of finished product

Quality control in construction projects is performed at every stage by using:

Información del documento

Subido en
24 de septiembre de 2026
Número de páginas
19
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QUINTER
3.6
(73)
Vendido
420
Seguidores
105
Artículos
39867
Última venta
4 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes