CMGT 2200 Final Part 3 -Questions with Correct
Answers
The project structural engineer develops the connection details for a steel frame structure
false
rigid and braced frames cannot be combined in one steel frame structure
false
Minimize the depth of the floor assembly
steel joist girders and steel joists
A shear stud is used
to develop composite action between the floor slab and beam
Pre-fabricated steel members commonly used for roof and floor structures
joists and girders
in a building separation joint in a steel structural frame using one column, the key
connection is a
slip connection
in a slip critical connection, two members are connected using
rivets
wrought iron
.02% carbon
Answers
The project structural engineer develops the connection details for a steel frame structure
false
rigid and braced frames cannot be combined in one steel frame structure
false
Minimize the depth of the floor assembly
steel joist girders and steel joists
A shear stud is used
to develop composite action between the floor slab and beam
Pre-fabricated steel members commonly used for roof and floor structures
joists and girders
in a building separation joint in a steel structural frame using one column, the key
connection is a
slip connection
in a slip critical connection, two members are connected using
rivets
wrought iron
.02% carbon