In order to obtain NOI coverage under the IGP, PRDs include: -
ANSWER-NOI and electronic certification by the LRP
Permit registration fee
Site Map
SWPPP
If the discharger must redact information in order to comply with
federal law that addresses security in the US, the discharger must
also submit - ANSWER-A written justification that the information
redaction is necessary to comply with federal law
What are three reasons for a discharger submitting an NOT in
SMARTs? - ANSWER--the facilities' industrial operations have
changed and are no longer subject to the IGP
-operation of the facility has been transferred to another entity
-the facility has ceased operations, completed closure activities,
and removed all industrial related pollutants
A person in which position would be eligible to be an LRP:
Maintenance supervisor, QISP consultant, Public works director, or
Monitoring consultant? - ANSWER-Public works director
The temporary suspension of industrial activities requires what to
be uploaded in SMARTS? - ANSWER--The justification for why the
monitoring is infeasible at the facility during the temporary
suspension
, -The projected date that the industrial activities will resume at the
facility
-SWPPP revisions specifically addresses the facility stabilization
BMPs
-The date the facility is fully stabilized for temporary suspension of
industrial activities
Authorized NSWDs include which of the following: discharges from
a broken water main in an employee parking lot; fire hydrant
testing; rinse water from industrial equipment washing, BMPs are
deployed as needed; water from landscape irrigation that runs
through the facility's stockpiled materials? - ANSWER-Fire Hydrant
Testing
Name four things required to be in the SWPPP? - ANSWER--Storm
Water Pollution Prevention Team members
-Potential pollutant sources
-Scheduled facility operating hours
-Minimum BMPs
Which of the following must the discharger identify on the facility
site map: a restroom's municipal sanitary sewer connection;
structural control measures; analytical sampling values from the
previous reporting year; each BMP implemented at the facility;
spills and leaks over 42 gallons from the previous 6 year period? -
ANSWER-Structural control measures
A discharger that has fulfilled the requirements for the temporary
suspension of industrial activities at a facility is not required to... -
ANSWER-Perform sampling and analysis of storm water discharges
because the discharger has justified that it is infeasible to do so
CORRECT SOLUTIONS 2026/GRADED A+
In order to obtain NOI coverage under the IGP, PRDs include: -
ANSWER-NOI and electronic certification by the LRP
Permit registration fee
Site Map
SWPPP
If the discharger must redact information in order to comply with
federal law that addresses security in the US, the discharger must
also submit - ANSWER-A written justification that the information
redaction is necessary to comply with federal law
What are three reasons for a discharger submitting an NOT in
SMARTs? - ANSWER--the facilities' industrial operations have
changed and are no longer subject to the IGP
-operation of the facility has been transferred to another entity
-the facility has ceased operations, completed closure activities,
and removed all industrial related pollutants
A person in which position would be eligible to be an LRP:
Maintenance supervisor, QISP consultant, Public works director, or
Monitoring consultant? - ANSWER-Public works director
The temporary suspension of industrial activities requires what to
be uploaded in SMARTS? - ANSWER--The justification for why the
monitoring is infeasible at the facility during the temporary
suspension
, -The projected date that the industrial activities will resume at the
facility
-SWPPP revisions specifically addresses the facility stabilization
BMPs
-The date the facility is fully stabilized for temporary suspension of
industrial activities
Authorized NSWDs include which of the following: discharges from
a broken water main in an employee parking lot; fire hydrant
testing; rinse water from industrial equipment washing, BMPs are
deployed as needed; water from landscape irrigation that runs
through the facility's stockpiled materials? - ANSWER-Fire Hydrant
Testing
Name four things required to be in the SWPPP? - ANSWER--Storm
Water Pollution Prevention Team members
-Potential pollutant sources
-Scheduled facility operating hours
-Minimum BMPs
Which of the following must the discharger identify on the facility
site map: a restroom's municipal sanitary sewer connection;
structural control measures; analytical sampling values from the
previous reporting year; each BMP implemented at the facility;
spills and leaks over 42 gallons from the previous 6 year period? -
ANSWER-Structural control measures
A discharger that has fulfilled the requirements for the temporary
suspension of industrial activities at a facility is not required to... -
ANSWER-Perform sampling and analysis of storm water discharges
because the discharger has justified that it is infeasible to do so