WGU Project Management C722, Unit 4
Module 12 Exam Questions and Answers
with Verified Solutions | Latest Updated 2026
The project contract offers the
contractor a bonus to complete the
project early, as long as the scope
is
met, quality is not decreased, and
budget is not exceeded. The
amount
of the bonus is based on how
many
days early the project is
completed.
Is this acceptable?
Yes
No
Maybe
Since the bonus is based on the
number of days the project
finishes
early, it is a type of cost savings.
The
bonus can be considered a
percentage of savings, not a set
amount, so it must be verified that
government regulations permit this
type of bonus compensation.
Depending on those regulations,
this
has the potential to go either way.
,What is a project scope? a. The desired result for a project
a. The desired result for a project
b. Project assumptions
c. The quality of a project
True or False: False: It means scope, cost, and schedule
The triple constraint means there
needs to be three justifications to
change anything in the project.
True or False: False: There are sometimes government
In the quality constraint, the mandated
customer can always revise the safety levels. In addition, reduction in
quality level to reduce costs or safety level
schedule. can lead to litigation if there are any
injuries related
to quality defects.
True or False: False: Project scope is a description of
A project scope is an instrument everything
used to view and evaluate a the project includes
project.
True or False: False: Correct! Scope creep should always
It is alright to have scope creep be
because it provides a better avoided because it will negatively impact
product cost,
or service to the customer. schedule, and quality.
, True or False: False: Any changes to scope must be
Scope creep is an expansion that documented.
occurs with changes to the scope If scope is reduced without documentation,
that are not documented in a then
change the required quality may not be met, and
process. This affects schedule and the
cost. Therefore, it is alright if product of the project will be unacceptable.
scope is
reduced without documented
changes.
What is an example of a milestone b. safety inspection
date? Milestone dates are key dates and critical
a. Critical path events,
b, Safety inspection such as safety inspections, which shape
c. Project float the project
schedule.
True or False: False: Float time is the difference between
Float time means that the time the time
required to complete a task is required for the critical path to complete
unknown and can vary (float and the
around). time for another path to complete.
Module 12 Exam Questions and Answers
with Verified Solutions | Latest Updated 2026
The project contract offers the
contractor a bonus to complete the
project early, as long as the scope
is
met, quality is not decreased, and
budget is not exceeded. The
amount
of the bonus is based on how
many
days early the project is
completed.
Is this acceptable?
Yes
No
Maybe
Since the bonus is based on the
number of days the project
finishes
early, it is a type of cost savings.
The
bonus can be considered a
percentage of savings, not a set
amount, so it must be verified that
government regulations permit this
type of bonus compensation.
Depending on those regulations,
this
has the potential to go either way.
,What is a project scope? a. The desired result for a project
a. The desired result for a project
b. Project assumptions
c. The quality of a project
True or False: False: It means scope, cost, and schedule
The triple constraint means there
needs to be three justifications to
change anything in the project.
True or False: False: There are sometimes government
In the quality constraint, the mandated
customer can always revise the safety levels. In addition, reduction in
quality level to reduce costs or safety level
schedule. can lead to litigation if there are any
injuries related
to quality defects.
True or False: False: Project scope is a description of
A project scope is an instrument everything
used to view and evaluate a the project includes
project.
True or False: False: Correct! Scope creep should always
It is alright to have scope creep be
because it provides a better avoided because it will negatively impact
product cost,
or service to the customer. schedule, and quality.
, True or False: False: Any changes to scope must be
Scope creep is an expansion that documented.
occurs with changes to the scope If scope is reduced without documentation,
that are not documented in a then
change the required quality may not be met, and
process. This affects schedule and the
cost. Therefore, it is alright if product of the project will be unacceptable.
scope is
reduced without documented
changes.
What is an example of a milestone b. safety inspection
date? Milestone dates are key dates and critical
a. Critical path events,
b, Safety inspection such as safety inspections, which shape
c. Project float the project
schedule.
True or False: False: Float time is the difference between
Float time means that the time the time
required to complete a task is required for the critical path to complete
unknown and can vary (float and the
around). time for another path to complete.