Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 25 páginas
Examen

PMT 3600V ADVANCED PROGRAM MANAGEMENT EXAM 2 2026 QUESTIONS AND ANSWERS

Document preview thumbnail
Vista previa 3 fuera de 25 páginas

PMT 3600V ADVANCED PROGRAM MANAGEMENT EXAM 2 2026 QUESTIONS AND ANSWERS

Vista previa del contenido

PMT 3600V ADVANCED PROGRAM
MANAGEMENT EXAM 2 2026
QUESTIONS AND ANSWERS




1. When a project’s To Complete Performance Index (TCPI) is calculated based on the

Estimate at Completion (EAC), and the result is 1.15, what does this indicate to the Program

Manager?

A. The project is currently 15% under budget and performing efficiently.


B. The project will likely finish 15% behind the scheduled completion date.


C. The project must perform at 115% efficiency for the remainder of the work to meet the

revised budget.


D. The Cost Performance Index (CPI) is currently 0.85 and cannot be improved.


Answer: C


Conceptual Explanation: TCPI measures the cost performance required on remaining

work to stay within a specific budget goal. A value greater than 1.0 indicates that more

efficiency is required than what has been achieved so far.

,2. In the context of the Adaptive Acquisition Framework (AAF), which pathway is specifically

designed for the rapid development and field-testing of prototypes to demonstrate new

capabilities?

A. Major Capability Acquisition


B. Middle Tier of Acquisition (MTA)


C. Software Acquisition


D. Urgent Capability Acquisition


Answer: B


Conceptual Explanation: The MTA pathway focuses on rapid prototyping and rapid

fielding to meet requirements within a five-year window, bypassing traditional long-term

milestones.


3. A Program Manager identifies a technical risk with a high probability of occurrence and a

critical impact. According to the Risk Management Guide for DOD Acquisition, what should be

the first step in the risk mitigation strategy?

A. Develop a risk handling plan that includes specific triggers and mitigation actions.


B. Allocate management reserve to cover the potential cost overrun.


C. Transfer the risk to the contractor through a Fixed-Price contract.


D. Immediately re-baseline the program to reflect the potential schedule slip.


Answer: A

, Conceptual Explanation: Risk management requires a formal handling plan identifying

strategies (Avoid, Transfer, Mitigate, Accept) before applying financial or schedule changes.


4. During a Technical Review, which event confirms that the ‘design-to’ baseline is

established and that the system is ready to proceed to detailed design?

A. System Requirements Review (SRR)


B. Critical Design Review (CDR)


C. Production Readiness Review (PRR)


D. Preliminary Design Review (PDR)


Answer: D


Conceptual Explanation: PDR establishes the allocated baseline (‘design-to’ baseline) and

ensures the preliminary design meets all requirements before moving to the ‘build-to’

phase.


5. Under the Weapon Systems Acquisition Reform Act (WSARA), what is the mandatory

requirement for programs before proceeding to Milestone B?

A. Completion of a full-rate production plan.


B. Execution of a Firm-Fixed Price contract.


C. Independent Cost Estimate (ICE) conducted by the CAPE.


D. Selection of a lead systems integrator.


Answer: C

Información del documento

Subido en
19 de agosto de 2026
Número de páginas
25
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Thebright
3.6
(44)
Vendido
234
Seguidores
6
Artículos
14496
Última venta
3 semanas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes