Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 11 páginas
Examen

NETTCP Concrete Inspector Certification Exam 2026/2027 | Questions & Answers | Concrete Inspection Study Guide

Document preview thumbnail
Vista previa 2 fuera de 11 páginas

NETTCP Concrete Inspector Exam Questions & Answers 2026/2027: Comprehensive certification preparation covering concrete materials, testing, reinforcement, pre-placement and placement operations, curing, repairs, specifications, quality control, and plan reading.

Vista previa del contenido

NETTCP Concrete Inspector Exam
False Quality assurance is defined as only those planned and systematic actions
taken by the agency to provide confidence that a product or facility will
perform satisfactorily in service. (1-1)


True A quality assurance program serves as a skeleton or overall framework
necessary for construction quality assurance implementation. (1-4)


True Joint development and review of quality assurance specifications should
include agency and industry personnel (engineers, inspectors, technicians) who
are directly responsible for construction. (1-5)




True The same six core elements required for design-bid-build construction QA
programs are also required for design-build construction QA programs. (1-8)


False Quality control activities include only sampling and testing. Visual inspection is
relegated to the acceptance inspector. (1-10)


True Quality control plans are project specific documents whose function is to
address specific production facility and field placement processes for
individual categories of work on a construction project. (1-11)


True Acceptance is the responsibility of the transportation agency. (1-12)


True The engineering limits are the absolute threshold values for individual test
results (1-15)


True Quality assurance specifications typically use quality measures. (1-14)


True Since the objective of the IA comparison is to identify discrepancies or
variability in testing procedures or equipment, IA testing is performed on split
samples. (1-20)


True If Contractor QC test results are not utilized in the acceptance decision, a
dispute resolution system is not required. (1-21)


True All Agency Central Laboratories are required under federal regulations to be
accredited through AASHTO Accreditation Program (AAP). (1-23)

, NETTCP Concrete Inspector Exam

True Personal Qualification/Certification programs should include requirements for
re-certification at 2 to 5 year intervals. (1-26)


True Each Agency Construction QA Program must meet the requirements of 23 CFR
637B and is required to be approved by FHWA. (1-27)


True The process of hydration begins immediately when the cement comes in
contact with water. (2-1)


True The cement paste density and strength are related. (2-1)


True AASHTO M 85 (ASTM C 150) stipulate cement types based on chemical
composition. (2-3)


False Type III cement is known as a low heat of hydration cement. (2-3)


True According to ACI 318, mixtures using Type I cement should be cured for 7 days.
(2-4)


True Lowering the heat of hydration in massive concrete structures is important to
prevent thermal cracking. (2-4)


True A type IP(10) is used to indicate a Portland-pozzolan blended product, with
10% pozzolan. (2-5)




True Expansive cement is a special product designed to offset stresses in concrete
caused by drying shrinkage, which when excessive can lead to cracking. (2-6)


True The time of set for cement paste is determined via a needle penetration
method. (2-7)


False Cement should be stored in humid or moist environments to ensure hydration
has started prior to being introduced into the concrete mixer. (2-8)


True A pozzolan is a material which in itself possesses little or no cementitious
activity, but when combined with hydraulic cement, will behave in a
cementitious manner. (3-1)


True Fly ash tends to increase the consistency of concrete when compared to
mixtures with just Portland Cement. (3-3)


False Dosages of air entrainment generally need to be lowered when fly ash is used.
(3-3)

Información del documento

Subido en
16 de agosto de 2026
Número de páginas
11
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
ExamBooster111
5.0
(3)
Vendido
3
Seguidores
1
Artículos
886
Última venta
2 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes