Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 111 pages
Exam (elaborations)

CDT 2 MOCK TEST WITH ANSWER RATIONALES 2026.

Document preview thumbnail
Preview 4 out of 111 pages

CDT 2 MOCK TEST WITH ANSWER RATIONALES 2026.

Content preview

CDT 2 MOCK TEST WITH ANSWER
RATIONALES 2026

◉ Bid shopping is the practice of:
A) Negotiating with two of more subcontractors for the lowest price
B) Revealing the sub bid of one subcontractor to another to obtain a
lower price
C) Encouraging cost cutting between subcontractors in Value
Analysis
D) Achieving the lowest sub bid for the Owners Benefit..
Answer: B


◉ During project conception, the four major values to be determined
are:
A)
economy, time, insulation, form.
B)
function, economy, time, problem.
C)
time, economy, form, goals.
D)
function, form, economy, time..

,Answer: B


◉ Which of the following will the courts use to interpret
specifications in the same manner as they interpret contracts?
A)
Autonomy to contract
B)
General takes precedence over specific.
C)
Professional negligence
D)
Construction for the drafter.
Answer: A


◉ Submittal requirements for Facility Services Divisions 21 through
28 are specified in:
A)
The first section in each respective division
B)
Supplementary Conditions
C)
Division 01 Section Submittal Procedures

,D)
Section 01 12 00 Summary of Multiple Contracts.
Answer: C


◉ Which of the following is a primary characteristic of Integrated
Project Delivery?
A)
Schematic Design is performed by the Contractor
B)
Recognition that intensified planning results in efficiency and
savings during execution
C)
IPD can only be used with the Design Build delivery method
D)
Reduced efficiency of Project Commissioning.
Answer: B


◉ A detailed description of an Alternate should be located in:
A)
The Bid Form.
B)
Division 01.

, C)
The Agreement.
D)
Sections in Divisions 2-49..
Answer: B


◉ Which of the following groups of Article Headings would occur in
Part 1 of the Three-Part SectionFormat?
A)
Fabrication, quality assurance, and references.
B)
References, submittals, and field quality control.
C)
References, submittals, and quality assurance.
D)
Warranties, allowances, and schedules..
Answer: C


◉ The Contractor should begin preparation and delivery of the
preconstruction submittals after which event?
A)
Bid opening

Document information

Uploaded on
August 16, 2026
Number of pages
111
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(12)
Sold
144
Followers
1
Items
51004
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions