• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 23 páginas
Examen

Afsb 152 Exam Prep Solved Questions Accurate Answers Premium Review

Document preview thumbnail
Vista previa 3 fuera de 23 páginas

AFSB 152 EXAM PREP SOLVED QUESTIONS ACCURATE ANSWERS PREMIUM REVIEW

Vista previa del contenido

AFSB 152 EXAM PREP SOLVED
QUESTIONS ACCURATE ANSWERS
PREMIUM REVIEW


◉ Surety
Answer: The party (usually an insurer) to a surety bond that
guarantees to the oblige that the principal will fulfill an obligation
or perform as required by the underlying contract, permit, or law.


◉ Obligee
Answer: The party to a surety bond that receives the surety's
guarantee that the principal will fulfill an obligation or perform as
promised.


◉ Principal
Answer: The party to a surety bond whose obligation or
performance the surety guarantees.


◉ Suretyship
Answer: The obligation of one entity to answer for the debt,
default, or miscarriage of performance of duties by another entity.


◉ Contract bond

,Answer: A surety bond guaranteeing the fulfillment of obligations
under construction contracts or other types of contracts.


◉ Bid bond
Answer: A contract bond guaranteeing that a contractor bidding
on a construction or supply contract will enter into the contract
and will provide a performance bond if the bid is accepted.


◉ Design/build
Answer: A construction method that offers "one-stop shopping" to
design and construction services.


◉ Construction mortgage
Answer: A loan that provides financing during the construction
period.


The owner usually pays interest on the funds borrowed but makes
no principal payment.


◉ Permanent mortgage
Answer: A loan that provides financing after construction is
complete.


Payments to the lender include both interest and principal, and
the mortgage is expected to be in effect for a number of years.

, ◉ Subcontractor (specialty contractor)
Answer: An independent contractor who specializes in a
particular kind of work and who is engaged by a general
contractor to perform a particular portion of the general
contractor's contract.


◉ Mobilization
Answer: The process before the construction begins that involves
initial activities to facilitate a construction process, such as
moving equipment and a field office onto the job site and
installing temporary utilities.


◉ Critical path method (CPM)
Answer: A process that identifies every major element of the
construction project, as well as a time estimate for each element,
and assembles these elements into one master schedule.


◉ Punch list
Answer: A list of small finishing tasks that must be accomplished
for completion.


◉ General building contractor
Answer: An independent contractor who obtains the primary
contract for a project and either completes all the work or
subcontracts portions (or all) of the work to other independent
contractors who specialize in such work.

Información del documento

Subido en
14 de agosto de 2026
Número de páginas
23
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$16.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
FocusFile7
4.0
(28)
Vendido
297
Seguidores
4
Artículos
75553
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes