CDT COMPREHENSIVE EXAM SCRIPT COMPLETE QUESTIONS VERIFIED SOLUTIONS
CDT Examination TEST 2026/2027 Questions and
Answers Verified Solutions Latest Update
Question:
AHJ - Authorities Having Jurisdiction.
Answer:
Protect public health, safety and welfare
Question:
Design Team.
Answer:
Address planning issues, determine design program, identify codes and regulations, produce
procurement and construction documents, administer construction contract, *provide QA/QC
procedures*
Question:
Contractor Team.
Answer:
Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and
material/product/equipment suppliers
Question:
Supplier Team.
Answer:
Furnishes the materials and products for the facility to be constructed. Fabricator, Distributor,
Manufacturer, Supplier.
,Question:
Facility Life Cycle.
Answer:
The life cycle of a facility, from concept through construction to use and eventual deconstruction.
Project Conception Project Delivery Design Construction Documents Procurement
(Bidding/Negotiating/Purchasing) Construction Facility Management
Question:
Project Conception.
Answer:
Transforms the needs of owner into clear concept on which project can be designed. Feasibility
Study, Programming, Site Selection, Budgeting.
Question:
Project Delivery.
Answer:
Determine delivery method to be used. Factors - qualifications, experience, capacity, project extent,
time requirements.
Question:
Design.
Answer:
Two Phases: schematic design and design development. Deliverables include graphic and written
design documents and estimates of project cost.
Question:
Schematic Design.
Answer:
,Overall relationships and functions. Site plan and area, general size/shape/massing of elements,
elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic
drawings, probable cost, preliminary schedules
Question:
Design Development.
Answer:
Technical issues of constructibility and integration of systems and components. Deliverables - Tech
information, outline specifications, updated schedule, updated cost estimate.
Question:
Construction Documents.
Answer:
Defined as the written and graphic documents prepared or assembled by the A/E for communicating
the project design for construction and administering the construction contract. Construction
documents include two major types of documents: Procurement documents and Contract
documents.
Question:
Procurement (Bidding/Negotiating/Purchasing).
Answer:
Acceptance of the contractor's bid or negotiated sum and other conditions will result in award of a
contract and commencement of work.
Question:
Construction.
Answer:
Responsibilities: Contractor - perform work, project coordination, comply with project documents.
A/E - construction admin, evaluation services, certify application for payment, final inspection of
work. Owner - provide information, process payments, approve contract modifications, accept
, project upon completion.
Question:
Facility Management.
Answer:
During occupancy, owners & facility managers maintain and evaluate the performance of the
project and determine suitability for continuing use.
Question:
OmniClass.
Answer:
A multi-table informational framework for organizing information used by the architectural,
engineering, and construction industry.
Question:
UniFormat.
Answer:
Uniform classification system for organizing preliminary construction information into a standard
order or sequence on the basis of systems or assemblies. Particularly useful in conceptual design.
Element Identification.
Question:
MasterFormat.
Answer:
Arranges related construction practices, logical groupings of work results, into a series of divisions.
50 division format. Used for Specifications, data organization, and cost classification.
Question:
CDT Examination TEST 2026/2027 Questions and
Answers Verified Solutions Latest Update
Question:
AHJ - Authorities Having Jurisdiction.
Answer:
Protect public health, safety and welfare
Question:
Design Team.
Answer:
Address planning issues, determine design program, identify codes and regulations, produce
procurement and construction documents, administer construction contract, *provide QA/QC
procedures*
Question:
Contractor Team.
Answer:
Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and
material/product/equipment suppliers
Question:
Supplier Team.
Answer:
Furnishes the materials and products for the facility to be constructed. Fabricator, Distributor,
Manufacturer, Supplier.
,Question:
Facility Life Cycle.
Answer:
The life cycle of a facility, from concept through construction to use and eventual deconstruction.
Project Conception Project Delivery Design Construction Documents Procurement
(Bidding/Negotiating/Purchasing) Construction Facility Management
Question:
Project Conception.
Answer:
Transforms the needs of owner into clear concept on which project can be designed. Feasibility
Study, Programming, Site Selection, Budgeting.
Question:
Project Delivery.
Answer:
Determine delivery method to be used. Factors - qualifications, experience, capacity, project extent,
time requirements.
Question:
Design.
Answer:
Two Phases: schematic design and design development. Deliverables include graphic and written
design documents and estimates of project cost.
Question:
Schematic Design.
Answer:
,Overall relationships and functions. Site plan and area, general size/shape/massing of elements,
elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic
drawings, probable cost, preliminary schedules
Question:
Design Development.
Answer:
Technical issues of constructibility and integration of systems and components. Deliverables - Tech
information, outline specifications, updated schedule, updated cost estimate.
Question:
Construction Documents.
Answer:
Defined as the written and graphic documents prepared or assembled by the A/E for communicating
the project design for construction and administering the construction contract. Construction
documents include two major types of documents: Procurement documents and Contract
documents.
Question:
Procurement (Bidding/Negotiating/Purchasing).
Answer:
Acceptance of the contractor's bid or negotiated sum and other conditions will result in award of a
contract and commencement of work.
Question:
Construction.
Answer:
Responsibilities: Contractor - perform work, project coordination, comply with project documents.
A/E - construction admin, evaluation services, certify application for payment, final inspection of
work. Owner - provide information, process payments, approve contract modifications, accept
, project upon completion.
Question:
Facility Management.
Answer:
During occupancy, owners & facility managers maintain and evaluate the performance of the
project and determine suitability for continuing use.
Question:
OmniClass.
Answer:
A multi-table informational framework for organizing information used by the architectural,
engineering, and construction industry.
Question:
UniFormat.
Answer:
Uniform classification system for organizing preliminary construction information into a standard
order or sequence on the basis of systems or assemblies. Particularly useful in conceptual design.
Element Identification.
Question:
MasterFormat.
Answer:
Arranges related construction practices, logical groupings of work results, into a series of divisions.
50 division format. Used for Specifications, data organization, and cost classification.
Question: