Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 36 páginas
Examen

CDT COMPREHENSIVE EXAM SCRIPT COMPLETE QUESTIONS VERIFIED SOLUTIONS.pdf

Document preview thumbnail
Vista previa 4 fuera de 36 páginas

CDT COMPREHENSIVE EXAM SCRIPT COMPLETE QUESTIONS VERIFIED SOLUTIONS.pdf

Vista previa del contenido

CDT COMPREHENSIVE EXAM SCRIPT COMPLETE QUESTIONS VERIFIED SOLUTIONS
CDT Examination TEST 2026/2027 Questions and
Answers Verified Solutions Latest Update

Question:
AHJ - Authorities Having Jurisdiction.

Answer:
Protect public health, safety and welfare



Question:
Design Team.

Answer:
Address planning issues, determine design program, identify codes and regulations, produce
procurement and construction documents, administer construction contract, *provide QA/QC
procedures*



Question:
Contractor Team.

Answer:
Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and
material/product/equipment suppliers



Question:
Supplier Team.

Answer:
Furnishes the materials and products for the facility to be constructed. Fabricator, Distributor,
Manufacturer, Supplier.

,Question:
Facility Life Cycle.

Answer:
The life cycle of a facility, from concept through construction to use and eventual deconstruction.
Project Conception Project Delivery Design Construction Documents Procurement
(Bidding/Negotiating/Purchasing) Construction Facility Management



Question:
Project Conception.

Answer:
Transforms the needs of owner into clear concept on which project can be designed. Feasibility
Study, Programming, Site Selection, Budgeting.



Question:
Project Delivery.

Answer:
Determine delivery method to be used. Factors - qualifications, experience, capacity, project extent,
time requirements.



Question:
Design.

Answer:
Two Phases: schematic design and design development. Deliverables include graphic and written
design documents and estimates of project cost.



Question:
Schematic Design.

Answer:

,Overall relationships and functions. Site plan and area, general size/shape/massing of elements,
elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic
drawings, probable cost, preliminary schedules



Question:
Design Development.

Answer:
Technical issues of constructibility and integration of systems and components. Deliverables - Tech
information, outline specifications, updated schedule, updated cost estimate.



Question:
Construction Documents.

Answer:
Defined as the written and graphic documents prepared or assembled by the A/E for communicating
the project design for construction and administering the construction contract. Construction
documents include two major types of documents: Procurement documents and Contract
documents.



Question:
Procurement (Bidding/Negotiating/Purchasing).

Answer:
Acceptance of the contractor's bid or negotiated sum and other conditions will result in award of a
contract and commencement of work.



Question:
Construction.

Answer:
Responsibilities: Contractor - perform work, project coordination, comply with project documents.
A/E - construction admin, evaluation services, certify application for payment, final inspection of
work. Owner - provide information, process payments, approve contract modifications, accept

, project upon completion.



Question:
Facility Management.

Answer:
During occupancy, owners & facility managers maintain and evaluate the performance of the
project and determine suitability for continuing use.



Question:
OmniClass.

Answer:
A multi-table informational framework for organizing information used by the architectural,
engineering, and construction industry.



Question:
UniFormat.

Answer:
Uniform classification system for organizing preliminary construction information into a standard
order or sequence on the basis of systems or assemblies. Particularly useful in conceptual design.
Element Identification.



Question:
MasterFormat.

Answer:
Arranges related construction practices, logical groupings of work results, into a series of divisions.
50 division format. Used for Specifications, data organization, and cost classification.



Question:

Información del documento

Subido en
2 de agosto de 2026
Número de páginas
36
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EddieJessup
3.5
(2)
Vendido
21
Seguidores
1
Artículos
7971
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes