A new mixed-use apartment complex is being planned just west of an existing city
center. In conducting site analysis, the project architect documents a myriad of
existing transportation options.
Which of the following is a true statement about the existing transportation on site?
Give this one a try later!
It promotes transit-oriented development (TOD). Existing transportation on
a project site can provide opportunities for the architect by meeting city or
county zoning requirements or ordinances that require a TOD, (i.e., higher-
density zoning)
Which of the following are aspects of site development typically constrained by
zoning regulations?
Give this one a try later!
, 1. Building setbacks
2. Historic preservation requirements
3. Signage restrictions
When are construction costs for different project delivery methods determined?
Give this one a try later!
DBB - after permitting
DB - before design starts
CM advisor - after permitting
fast track - after DD
A list of special inspections as required by the county building inspector follows. The
reinforcing in the post-tensioned slab will be inspected next. Click on the box in the
list that corresponds to this inspection.
Give this one a try later!
The reinforcing for post-tensioned concrete is included in the inspection
for item #5 - Prestressed Concrete and PT tendons. PT stands for post-
tensioned and the tendons are the steel cables that reinforce the slab.
Which of the following issues are the primary issues that need to be considered when
determining the project delivery method?
Give this one a try later!
1. Driving factor for the project
2. Number and type of design and construction contracts
center. In conducting site analysis, the project architect documents a myriad of
existing transportation options.
Which of the following is a true statement about the existing transportation on site?
Give this one a try later!
It promotes transit-oriented development (TOD). Existing transportation on
a project site can provide opportunities for the architect by meeting city or
county zoning requirements or ordinances that require a TOD, (i.e., higher-
density zoning)
Which of the following are aspects of site development typically constrained by
zoning regulations?
Give this one a try later!
, 1. Building setbacks
2. Historic preservation requirements
3. Signage restrictions
When are construction costs for different project delivery methods determined?
Give this one a try later!
DBB - after permitting
DB - before design starts
CM advisor - after permitting
fast track - after DD
A list of special inspections as required by the county building inspector follows. The
reinforcing in the post-tensioned slab will be inspected next. Click on the box in the
list that corresponds to this inspection.
Give this one a try later!
The reinforcing for post-tensioned concrete is included in the inspection
for item #5 - Prestressed Concrete and PT tendons. PT stands for post-
tensioned and the tendons are the steel cables that reinforce the slab.
Which of the following issues are the primary issues that need to be considered when
determining the project delivery method?
Give this one a try later!
1. Driving factor for the project
2. Number and type of design and construction contracts