Design-assist contracting
Give this one a try later!
best for complexity
- specialty contractors are included early in the design phase to develop
and draw complex or proprietary contrition details
B214-2012
Give this one a try later!
Standard form of architect services: LEED Certification
,additional services
Give this one a try later!
services added after the contract is signed for work that is not covered
initially under basic or supplemental services or supplemental changes to
the project schedule or budget. this may include:
- failure of performance by owner or owner consultants
- public presentations, meetings, or hearings/ dispute resolution
- preparing digital models for owner consultants
- public presentations, meetings, or hearings/ disputes resolutions
- evaluation extensive number of claims
- out of sequence submittal review
- substituting from owner or contractor that entail changing the
construction drawings
consensus docs
Give this one a try later!
set of contracts developed by contractor and trade groups to end what
they see as a bias towards the architect in the AIA contracts
float
Give this one a try later!
, the amount of time a task can be delayed without causing delay to
subsequent tasks. an activity float can be started or finished within range of
time prior to project completion date without affecting the overall
schedule
Article 4: Supplemental Services
Give this one a try later!
supplemental services and additional services
bridging design-build
Give this one a try later!
best for risk and quality
- architect/ engineer hired as consultant at start of process:
- A/E develops project requirements, preliminary scope drawings
- A/E hires design build firm to take over project
- A/E reviews work of Design Build firm behalf of owner
Article 6: Cost of work
Give this one a try later!
Give this one a try later!
best for complexity
- specialty contractors are included early in the design phase to develop
and draw complex or proprietary contrition details
B214-2012
Give this one a try later!
Standard form of architect services: LEED Certification
,additional services
Give this one a try later!
services added after the contract is signed for work that is not covered
initially under basic or supplemental services or supplemental changes to
the project schedule or budget. this may include:
- failure of performance by owner or owner consultants
- public presentations, meetings, or hearings/ dispute resolution
- preparing digital models for owner consultants
- public presentations, meetings, or hearings/ disputes resolutions
- evaluation extensive number of claims
- out of sequence submittal review
- substituting from owner or contractor that entail changing the
construction drawings
consensus docs
Give this one a try later!
set of contracts developed by contractor and trade groups to end what
they see as a bias towards the architect in the AIA contracts
float
Give this one a try later!
, the amount of time a task can be delayed without causing delay to
subsequent tasks. an activity float can be started or finished within range of
time prior to project completion date without affecting the overall
schedule
Article 4: Supplemental Services
Give this one a try later!
supplemental services and additional services
bridging design-build
Give this one a try later!
best for risk and quality
- architect/ engineer hired as consultant at start of process:
- A/E develops project requirements, preliminary scope drawings
- A/E hires design build firm to take over project
- A/E reviews work of Design Build firm behalf of owner
Article 6: Cost of work
Give this one a try later!