Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 17 páginas
Examen

FEMA ICS Exam Questions and Answers Verified Solutions Latest Update

Document preview thumbnail
Vista previa 3 fuera de 17 páginas

FEMA ICS Exam Questions and Answers Verified Solutions Latest Update

Vista previa del contenido

FEMA ICS Exam Questions and
Answers Verified Solutions Latest
Update


Question:

A buyer for a governmental entity ran into the IT director in the break room while
having a cup of coffee. The IT director is a new hire from the private sector. He
indicated that he was planning a large purchase of external hard drives for use in the
various offices. What should the buyer do with this information?

Answer:
Go back to his office and send the IT director an email recapping the discussion and
requesting that he send a requisition with specifications.


Question:

Off-the-shelf, commercially available and ready-made are all terms associated with

Answer:
Standard Specification


Question:

Which of the following options describes an important consideration when developing a
strategic plan?

Answer:
Each element is aligned with and supports the other elements


Question:

The four steps for the strategic planning development include

Answer:


Question:

Outline the entity's mission, programs, resources, and support systems.

,Question:

Identify what works well and what needs improved.


Question:

Identify how improvements should be made and then determine the best method to
make improvements.


Question:

Include the improvements as strategies in the strategic plan and connect to the
alignment path.


Question:

A school district buyer has a mandate from the Board to increase SWMBE (small,
woman-owned, minority-owned business enterprise) opportunities. Which of the
following would be the best step for her to take in order to do so.

Answer:
Engage DBEs in procurements which require little or no competition


Question:

LEED provides a point rating system to score green building design and construction
and points are distributed across eight credit categories

Answer:
Sustainable Sites-This category measures the extent to which the entire property is
used to mitigate the project's impact on the site. Water Efficiency-This category is
evaluated by the level in which the construction project includes water conservation
strategies, which may be inside or outside and build into the structure. Energy and
Atmosphere-This category evaluates the measures taken to optimize energy efficiency
and use of efficient HVAC systems. Materials and Resources-This category measures
the means by which the amount of wastes may be reduced during the building of the
structure; and selection of sustainable materials. Indoor Environmental Quality-This
category evaluates the planning of optimal indoor air quality through the planned
reduction of air pollution using energy-efficient appliances and other ventilation
measures. Innovation in Design-This category includes the use of innovative measures
in design and performance through collaborations by all stakeholders in the building
process. Regional Priority-This category provides credits for construction planning
which addresses challenges, which may be predetermined to be unique to the region in
which the construction is located. Location and Transportation-This category evaluates
the location of the project and the ease by which stakeholders may travel to and from
the facility once it is completed.

, Question:

A Procurement Specialist in a large city is in the planning stages of a waste
management contract in a municipality in which labor unions are prevalent. Which is a
concern that may be addressed in the solicitation?

Answer:
Workers safety, The labor movement is often tied to worker safety. The International
Labor Rights Forum works with networks around the world to address working
conditions.


Question:

An entity would like to invite more participation by local businesses. What strategy may
the Procurement Officer use in order to do so?

Answer:
Speaking at local Chamber of Commerce meetings; Building relationships with
suppliers through their organizations is a great way to show genuine interest in doing
business with them and is the best choice.


Question:

Strategic Planning

Answer:
A course of action to achieve long range goals, generally up to 5 years. Reflects the
companies direction and its purpose as stated in the mission statement


Question:

Tactical Planning

Answer:
Shorter time frame and narrower scope than strategic. A course of action to achieve
short term generally within a year or less. They are concerned with the unit beneath
top management must do, how they must do it and who has responsibility

Información del documento

Subido en
27 de julio de 2026
Número de páginas
17
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
336
Última venta
-


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes