AIC EXAM PACKAGE 2026 CERTIFICATION EVALUATION EXAMS COMPLETE QUESTIONS AND ANSWERS

Document preview thumbnail
Vista previa 4 fuera de 47 páginas

AIC EXAM PACKAGE 2026 CERTIFICATION EVALUATION EXAMS COMPLETE QUESTIONS AND ANSWERS

Vista previa del contenido

AIC EXAM PACKAGE 2026 CERTIFICATION
EVALUATION EXAMS COMPLETE QUESTIONS
AND ANSWERS

◉ 6ft.
Answer: What is the allowable Maximum height of an open sided
floor before fall protection measures must be provided for workers?
a. 3ft b. 6ft c. 10ft d. 15ft


◉ A project which includes responsibility for the design, building,
fencing, and leasing of a new office building..
Answer: Which of the following projects have the highest potential
profit for the contractor?
a. A competitive bid on a new school where there are fifteen other
bids b. A job where the contractor would be the construction
manager with a fixed fee c. A job to bid on a new highway project
built through an open field with only four other competitors d. A
project which includes responsibility for the design, building,
fencing, and leasing of a new office building.


◉ The loading on the sling will increase.
Answer: Rigging is being connected to a piece of equipment that will
be lifted to a roof approximately 35ft high. How will slings lifting

,capacity be affected, using a low-sitting 29º angle instead of 45º
angle?
a. The loading will be safer b. The loading on the sling will be
reduced c. The loading in the wire rope will decrease d. The loading
on the sling will increase


◉ Fire walls and fire stops.
Answer: Building codes typically account for the fact that light wood
framing is highly combustible by requiring
a. Thick lumber b. Fire resistant material c. Fire walls and fire stops
d. Type MR drywalls (Green Board)


◉ Safely breaks into small pieces.
Answer: What is the major reason for using tempered glass?
a. Is temperature resistance b. Safely breaks into small pieces c. Has
insulation qualities d. Has decorative qualities


◉ Expediting.
Answer: Material was appropriately ordered with sufficient lead
time to be available on the site when needed; however, the vendor
delivered the material three weeks late. Which of the following
activities was poorly practiced by the contractor?
a. Expediting b. Purchasing c. Receiving d. Shipping

,◉ Procurement of long lead items.
Answer: The construction contract requires the contractor to submit
a complete schedule. This draft so far includes work activities, their
duration, and milestones. Which of the following other information
is necessary to develop this schedule?
a. OSHA inspections b. Procurement of long lead items c. Schedule of
values d. List of payment application document.


◉ Identify the activities.
Answer: In creating a schedule, which of the following occurs first?
a. Develop the logic b. Perform the duration calculations c. Identify
the activities b. Input the information into the network.


◉ Designated competent person.
Answer: Who is responsible for inspecting for safety risks on a
project prior to operation?
a. Project superintend b. Company safety officer c. Structural steel
Forman d. Designated competent person.


◉ Master format.
Answer: What format is based on the CSI conceptual estimating
systems?
a. Uniformat b. Section format c. Master format d. Project Manuel
format

, ◉ Updated the schedule and notify the owner of the options and
associated costs.
Answer: What is the best action for a contractor to take concerning a
project that is one month behind schedule due to incomplete and
late architectural drawings?
a. Work overtime to meet the completion date and not bid for the
premium time. b. Updated the schedule and notify the owner of the
options and associated costs c. Inform all subs that the schedule
must be made and extra compensation will be paid d. Create a
revised construction schedule with the assistance of the architect


◉ Finish to Start.
Answer: When the start of one activity depends on the completion of
the preceding activity, the relationship on a logic network of the two
activities is a
a. Finish to Finish b. Finish to Start c. Start to Finish d. Start to Start


◉ Hand out an agenda and see the team member has it prior to the
meeting so they can come prepared.
Answer: To conduct an effective team meeting, it is best to
a. Develop an agenda for own use only b. Develop a list of topics for
the agenda at the begging of the meeting so that everyone has input.
c. Hand out an agenda and see the team member has it prior to the
meeting so they can come prepared. d. Develop an agenda and see

Información del documento

Subido en
24 de julio de 2026
Número de páginas
47
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TopGradeInsider
4.2
(12)
Vendido
142
Seguidores
1
Artículos
51010
Última venta
15 horas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes