The _________ consists of daily checks of the work to assure continuing
compliance with contract requirements - ANSWER ✔✔Follow-up
Phase
Design-Build contracts require - ANSWER ✔✔The QC Manager to be
in place and take an active role in the review and coordination of the
design.
, Which of the following is included in all three phases of the Three
Phases of Control? - ANSWER ✔✔Safety
The purpose of Construction Quality Management is to - ANSWER
✔✔Achieve the quality established by properly developed requirements
through the combined responsibility, but separate, efforts of contractors
and government personnel
Testing is extremely important in construction quality management and is
performed by - ANSWER ✔✔Both the contractor and the government
The primary purpose of the Three-Phase Control System is to -
ANSWER ✔✔Require the contractor to plan, schedule, and perform
quality management actions to assure work meets all specified quality
standards
Quality Assurance Personnel have the responsibility to - ANSWER
✔✔Require the contractor to maintain the quality specified in the plans
and specifications
The _________________ is the appropriate time to assure that all
materials and/or equipment have been tested, submitted, and approved
- ANSWER ✔✔Preparatory Phase