NCCCO Core Prep Test 2
Complete Chapters Solutions Manual
are Included
** Final Exam Questions With 100%
Correct Answers | Grade A+
** Guaranteed Pass
** Updated | New Version
, What is the purpose of installing an auxiliary boom point Separate hoist lines
sheave to the main boom tip? 3 multiple choice options
A designated Lift Director shall be assigned by the Site Supervisor
______? 3 multiple choice options
Who is responsible for calculating net capacity? Crane Operator
3 multiple choice options
Who is responsible for ensuring all rigging is supervised Site Supervisor/ Lift Director
by a Qualified Rigger? 3 multiple choice options
Who is responsible for ensuring the crane owner is Crane User
notified of any damage to the crane or 3 multiple choice options
replacement/repair of wire rope?
Who is responsible for restricting unauthorized access to Site Supervisor/Lift Director
the crane's work area? 3 multiple choice options
Who is responsible for ensuring the crane owner is Crane User
notified of any damage to the crane or 3 multiple choice options
replacement/repair of wire rope?
Who is responsible for ensuring crane operations are Lift Director
stopped if alerted to an unsafe condition? 3 multiple choice options
If the operator or A/D determine that ground conditions Controlling Entity
are not suitable for the equipment being operated, they 3 multiple choice options
should request the _________ correct the issue
Who is responsible for ensuring that personnel involved Lift Director
in crane operations understand their responsibilities, 3 multiple choice options
assigned duties and associated hazards?
When can the operator of a crane set the crane up with When the load chart allows
less than fully extended outriggers? 3 multiple choice options
The outrigger pad and cribbing should be strong enough The total weight of the crane and the load
to support? 3 multiple choice options
What must be known prior to setting up your crane? Location of underground vaults
3 multiple choice options
What is the minimum distance the flange on the hoist ½ inch
drum should extend above the last wrap of rope? 3 multiple choice options
Eccentric main boom tip reeving will Twisting of the boom
3 multiple choice options
What is the most common wire rope used on most Right regular lay
cranes? 3 multiple choice options