FDOT Asphalt Paving Level 1 Exam with || || || || || || ||
verified detailed answers || ||
S to N - ✔✔Downstation
|| || || ||
W to E - ✔✔Downstation
|| || || ||
Stationing - ✔✔Starts at 0+00 || || || ||
Stationing Measurement - ✔✔1+00 is 100 feet || || || || || ||
Straight Edge is the - ✔✔Measurement of Pavement smoothness with a 15 foot
|| || || || || || || || || || || || ||
4.573 m rolling straightedge
|| || ||
Straight Edge is used to - ✔✔identify problems
|| || || || || || ||
Random sampling - ✔✔Are random numbers generated usually by a VT for
|| || || || || || || || || || || ||
cores to be extracted from the roadway
|| || || || || ||
How often should you calibrate a Straight edge - ✔✔Calibrate at the start of
|| || || || || || || || || || || || || ||
each working period
|| ||
, 2
Using the manual straight edge you find what kind of spot to place the rolling
|| || || || || || || || || || || || || || ||
straightedge? - ✔✔Locate a flat area with the manual straightedge and place || || || || || || || || || || || ||
the rolling straightedge next to the manual straightedge and the gauge should
|| || || || || || || || || || || ||
read 0 ||
The 3/16 and the 3/8 shims go under which wheels during calibration - ✔✔The
|| || || || || || || || || || || || || ||
outside wheels to measure the low and the center to measure the high. Gauge
|| || || || || || || || || || || || || ||
should read 3/16 on the 3/16 shim and vice versa for the 3/8 shims. Make sure
|| || || || || || || || || || || || || || || ||
the center wheel moves up and down freely.
|| || || || || || ||
Calibration materials for Straightedge - ✔✔Rolling Straightedge || || || || || ||
Manual Straightedge ||
Manual Measurement (ruler) || ||
x4 3/16 shims 5mm thick
|| || || ||
x4 3/8 shims 10mm thick
|| || || ||
When to perform final straightedge - ✔✔After an entire lane has been paved
|| || || || || || || || || || || ||
When to perform final straightedge - ✔✔Pavement should be an ambient
|| || || || || || || || || || ||
temperature
You cannot use the straightedge until it has been properly - ✔✔calibrated
|| || || || || || || || || || ||
When performing the straightedge procedure - ✔✔Maintain proper traffic
|| || || || || || || || ||
management and safety || ||
FDOT Asphalt Paving Level 1 Exam with || || || || || || ||
verified detailed answers || ||
S to N - ✔✔Downstation
|| || || ||
W to E - ✔✔Downstation
|| || || ||
Stationing - ✔✔Starts at 0+00 || || || ||
Stationing Measurement - ✔✔1+00 is 100 feet || || || || || ||
Straight Edge is the - ✔✔Measurement of Pavement smoothness with a 15 foot
|| || || || || || || || || || || || ||
4.573 m rolling straightedge
|| || ||
Straight Edge is used to - ✔✔identify problems
|| || || || || || ||
Random sampling - ✔✔Are random numbers generated usually by a VT for
|| || || || || || || || || || || ||
cores to be extracted from the roadway
|| || || || || ||
How often should you calibrate a Straight edge - ✔✔Calibrate at the start of
|| || || || || || || || || || || || || ||
each working period
|| ||
, 2
Using the manual straight edge you find what kind of spot to place the rolling
|| || || || || || || || || || || || || || ||
straightedge? - ✔✔Locate a flat area with the manual straightedge and place || || || || || || || || || || || ||
the rolling straightedge next to the manual straightedge and the gauge should
|| || || || || || || || || || || ||
read 0 ||
The 3/16 and the 3/8 shims go under which wheels during calibration - ✔✔The
|| || || || || || || || || || || || || ||
outside wheels to measure the low and the center to measure the high. Gauge
|| || || || || || || || || || || || || ||
should read 3/16 on the 3/16 shim and vice versa for the 3/8 shims. Make sure
|| || || || || || || || || || || || || || || ||
the center wheel moves up and down freely.
|| || || || || || ||
Calibration materials for Straightedge - ✔✔Rolling Straightedge || || || || || ||
Manual Straightedge ||
Manual Measurement (ruler) || ||
x4 3/16 shims 5mm thick
|| || || ||
x4 3/8 shims 10mm thick
|| || || ||
When to perform final straightedge - ✔✔After an entire lane has been paved
|| || || || || || || || || || || ||
When to perform final straightedge - ✔✔Pavement should be an ambient
|| || || || || || || || || || ||
temperature
You cannot use the straightedge until it has been properly - ✔✔calibrated
|| || || || || || || || || || ||
When performing the straightedge procedure - ✔✔Maintain proper traffic
|| || || || || || || || ||
management and safety || ||