Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 92 páginas
Examen

NORTH CAROLINA (NC) (H) GRADING & EXCAVATING COMPREHENSIVE STUDY GUIDE & PRACTICE EXAM QUESTIONS WITH VERIFIED ANSWERS AND RATIONALES EDITION | INSTANT PDF DOWNLOAD

Document preview thumbnail
Vista previa 4 fuera de 92 páginas

NORTH CAROLINA (NC) (H) GRADING & EXCAVATING COMPREHENSIVE STUDY GUIDE & PRACTICE EXAM QUESTIONS WITH VERIFIED ANSWERS AND RATIONALES EDITION | INSTANT PDF DOWNLOAD

Vista previa del contenido

NORTH CAROLINA (NC) (H) GRADING &
EXCAVATING COMPREHENSIVE STUDY GUIDE &
PRACTICE EXAM QUESTIONS WITH VERIFIED
ANSWERS AND RATIONALES 2026-2028 EDITION |
INSTANT PDF DOWNLOAD

1. Which North Carolina agency issues the "H" Grading and Excavating
contractor license?
A. North Carolina Department of Transportation (NCDOT)
B. North Carolina Licensing Board for General Contractors (NCLBGC)
C. North Carolina Department of Labor (NCDOL)
D. North Carolina Division of Water Resources
ANSWER: B
Rationale: The North Carolina Licensing Board for General Contractors
(NCLBGC) is the statutory body that administers licensing for general contractors,
including the "H" (Grading and Excavating) classification.


2. Under North Carolina General Statutes, what is the minimum construction
contract value that requires a contractor to hold a general contractor's
license?
A. $15,000
B. **$30,000**
C. $40,000
D. $50,000
ANSWER: B
Rationale: North Carolina law requires a general contractor's license for any
construction project with a total cost of $30,000 or more, including grading and
excavation work.

,3. Which North Carolina statute governs the licensure requirements for a
grading and excavating contractor classified as "H"?
A. G.S. 89-1
B. G.S. 89-17
C. G.S. 89-15
D. G.S. 89-20
ANSWER: C
Rationale: G.S. 89-15 outlines the licensing, renewal, display, and classification
limits for contractors, including the "H" grading and excavating classification.


4. What is the minimum working capital requirement for a Limited
classification "H" contractor in North Carolina?
A. $10,000
B. **$17,000**
C. $75,000
D. $150,000
ANSWER: B
Rationale: A Limited classification contractor must demonstrate working capital of
at least $17,000, which allows bids up to $500,000.


5. What is the maximum project value a Limited classification "H" contractor
can bid on in North Carolina?
A. $250,000
B. **$500,000**
C. $1,000,000
D. Unlimited
ANSWER: B
Rationale: The Limited classification allows contractors to bid on projects up to
$500,000. Intermediate classification allows up to $1,000,000, and Unlimited has
no monetary cap.

,6. What is the minimum working capital requirement for an Intermediate
classification "H" contractor?
A. $17,000
B. $50,000
C. **$75,000**
D. $150,000
ANSWER: C
Rationale: An Intermediate classification contractor must demonstrate working
capital of at least $75,000, allowing bids up to $1,000,000.


7. What is the minimum working capital requirement for an Unlimited
classification "H" contractor?
A. $17,000
B. $75,000
C. $100,000
D. **$150,000**
ANSWER: D
Rationale: An Unlimited classification contractor must demonstrate working
capital of at least $150,000, with no monetary cap on project value.


8. How often must an "H" contractor's license be renewed in North Carolina?
A. Every year (12 months)
B. Every two years (24 months)
C. Every three years (36 months)
D. Every five years (60 months)
ANSWER: B
Rationale: "H" contractor licenses must be renewed every two years (24 months)
by the North Carolina Licensing Board for General Contractors.

, 9. Which license class in North Carolina allows a contractor to perform
unlimited earth-moving work without a monetary cap?
A. Limited
B. Intermediate
C. Unlimited
D. Specialty
ANSWER: C
Rationale: The Unlimited license authorizes all general contracting work,
including unlimited grading and excavating, whereas Limited and Intermediate
have monetary caps.


10. Under the "H" classification, which of the following is NOT authorized for
use?
A. Hydraulic excavator
B. Skid-steer loader
C. Explosive-driven demolition hammer
D. Grader
ANSWER: C
Rationale: The "H" classification permits standard earth-moving equipment but
does not allow the use of explosives, which require a separate "E" classification.


11. According to NC 811 law, how far in advance must a contractor contact
utility companies before digging?
A. 24 hours
B. 48 hours (3 full working days)
C. 72 hours
D. One week
ANSWER: B
Rationale: The NC 811 law requires contact at least 48 hours (3 full working days)
before digging to have utilities marked.

Información del documento

Subido en
18 de julio de 2026
Número de páginas
92
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$29.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
5
Seguidores
0
Artículos
1673
Última venta
3 horas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes