The 1970's law that set into place the regulation of stormwater is:
The Clean Water Act
Requirements for managing stormwater activity on a construction site are
outlined in the following regulation:
NPDES
Which of the following is never an allowable stormwater discharge from a
construction site?
Discharge from contaminated groundwater
The Notice of termination can filed when:
All construction activity, inside and outside the building, is complete and permanent
stabilization verified
Relative to stormwater permitting, all of the following must occur before
construction starts except:
Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates
rainfall energy and slows overland flow of stormwater
Vegetation
Management Exam QUESTIONS AND
VERIFIED ANSWERS WITH RATIONALES
JUST RELEASED.pdf
The 1970's law that set into place the regulation of stormwater is:
The Clean Water Act
Requirements for managing stormwater activity on a construction site are
outlined in the following regulation:
NPDES
Which of the following is never an allowable stormwater discharge from a
construction site?
Discharge from contaminated groundwater
The Notice of termination can filed when:
All construction activity, inside and outside the building, is complete and permanent
stabilization verified
Relative to stormwater permitting, all of the following must occur before
construction starts except:
Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates
rainfall energy and slows overland flow of stormwater
Vegetation