MSSC MAINTENANCE CORRECT COMPREHENSIVE
QUESTIONS AND ANSWERS SURE A+
✔✔In a well-organized plant, it should take a worker __________ to find the right tool.
- 30 seconds
- 1 minute
- 5 minutes
- 10 minutes - ✔✔30 seconds
✔✔__________ should preside over housekeeping inspections or audits.
- Unbiased auditors or inspectors
- The company president
- The safety team
- The immediate supervisor - ✔✔Unbiased auditors or inspectors
✔✔Sensor monitoring is the most useful aspect of what program?
- Preventive maintenance
- Predictive maintenance
- Reactive maintenance
- Corrective maintenance - ✔✔Predictive maintenance
✔✔A workstation designed to __________ can reduce repetitive/stress injuries.
- Maximize range of motions
- Minimize motions
- Increase unnecessary motion
- Increase product output - ✔✔Minimize motions
✔✔An example of preventive maintenance is __________.
- Replacing components after they have failed
- Scheduled replacement of minor parts that wear out quickly
- Replacing an item that has been damaged
,- Arranging for an OSHA inspection of equipment - ✔✔Scheduled replacement of minor
parts that wear out quickly
✔✔What contains equipment histories as well as maintenance, service, and preventive
maintenance records?
- Computerized maintenance management systems (CMMS)
- Computerized maintenance management information systems (CMMIS)
- Equipment maintenance management software (EMMS)
- All of the above - ✔✔All of the above
✔✔Predictive maintenance is a type of maintenance program that does what function?
- Determines regular maintenance intervals when maintenance should be performed
- Predicts the specific date when maintenance should be performed
- Identifies machine part or component failures before a major breakdown
- Provides startup and shutdown guidelines - ✔✔Identifies machine part or component
failures before a major breakdown
✔✔What is an example of failure to follow preventive maintenance?
- Lubricating bearings as prescribed
- Skipping a scheduled cleaning
- Replacing V-belts in sets
- Filter replacement - ✔✔Skipping a scheduled cleaning
✔✔To make sure tools remain in good working order, __________.
- Store them properly
- Do not use them unless absolutely necessary
- Use oversized tools
- Do not clean them off after use - ✔✔Store them properly
✔✔When opening supplies at a workstation, place excess packaging materials where?
- In the machine
- On the floor
- In appropriate trash/recycle bin
- In the aisle - ✔✔In appropriate trash/recycle bin
✔✔Bearing seals can be damaged by what?
- Routine lubrication processes
- Excessive lubrication
- Shortening the run time
- Proper burn-in - ✔✔Excessive lubrication
✔✔What is most closely associated with repair of broken parts?
- Preventive maintenance
- Predictive maintenance
, - Breakdown maintenance
- PDCA cycles - ✔✔Breakdown maintenance
✔✔Equipment should be inspected and reported to whom at the start of the production
day?
- The incoming shift
- The auditor
- All personnel
- Appropriate parties - ✔✔Appropriate parties
✔✔Workers should perform an emergency shutdown of their equipment and notify their
supervisor in which of the following circumstances?
- They notice that the equipment temperature is gradually rising but still within allowable
limits.
- They hear a loud banging noise coming from the equipment.
- They detect vibration levels that are within the allowable range.
- They are notified of a family emergency and need to go home. - ✔✔They hear a loud
banging noise coming from the equipment.
✔✔__________ are not permitted on the floor of a workstation.
- Extension cords
- Painted lines
- Trash cans
- Non-slip mats - ✔✔Extension cords
✔✔What is preventive maintenance defined as?
- Condition-based servicing
- Run-to-breakdown production
- Plan-Do-Check-Act (PDCA) cycles
- Routine servicing at predetermined intervals - ✔✔Routine servicing at predetermined
intervals
✔✔The best way to store liquids such as paint or cleaning fluids is __________.
- Sealed and in a cabinet
- On the workbench
- Near a window for ventilation
- Under the workbench for easy access - ✔✔Sealed and in a cabinet
✔✔__________ should be replaced immediately if found to be missing during an
equipment inspection.
- Safety guarding
- Foot rests
- A maintenance report
- A borescope - ✔✔Safety guarding
QUESTIONS AND ANSWERS SURE A+
✔✔In a well-organized plant, it should take a worker __________ to find the right tool.
- 30 seconds
- 1 minute
- 5 minutes
- 10 minutes - ✔✔30 seconds
✔✔__________ should preside over housekeeping inspections or audits.
- Unbiased auditors or inspectors
- The company president
- The safety team
- The immediate supervisor - ✔✔Unbiased auditors or inspectors
✔✔Sensor monitoring is the most useful aspect of what program?
- Preventive maintenance
- Predictive maintenance
- Reactive maintenance
- Corrective maintenance - ✔✔Predictive maintenance
✔✔A workstation designed to __________ can reduce repetitive/stress injuries.
- Maximize range of motions
- Minimize motions
- Increase unnecessary motion
- Increase product output - ✔✔Minimize motions
✔✔An example of preventive maintenance is __________.
- Replacing components after they have failed
- Scheduled replacement of minor parts that wear out quickly
- Replacing an item that has been damaged
,- Arranging for an OSHA inspection of equipment - ✔✔Scheduled replacement of minor
parts that wear out quickly
✔✔What contains equipment histories as well as maintenance, service, and preventive
maintenance records?
- Computerized maintenance management systems (CMMS)
- Computerized maintenance management information systems (CMMIS)
- Equipment maintenance management software (EMMS)
- All of the above - ✔✔All of the above
✔✔Predictive maintenance is a type of maintenance program that does what function?
- Determines regular maintenance intervals when maintenance should be performed
- Predicts the specific date when maintenance should be performed
- Identifies machine part or component failures before a major breakdown
- Provides startup and shutdown guidelines - ✔✔Identifies machine part or component
failures before a major breakdown
✔✔What is an example of failure to follow preventive maintenance?
- Lubricating bearings as prescribed
- Skipping a scheduled cleaning
- Replacing V-belts in sets
- Filter replacement - ✔✔Skipping a scheduled cleaning
✔✔To make sure tools remain in good working order, __________.
- Store them properly
- Do not use them unless absolutely necessary
- Use oversized tools
- Do not clean them off after use - ✔✔Store them properly
✔✔When opening supplies at a workstation, place excess packaging materials where?
- In the machine
- On the floor
- In appropriate trash/recycle bin
- In the aisle - ✔✔In appropriate trash/recycle bin
✔✔Bearing seals can be damaged by what?
- Routine lubrication processes
- Excessive lubrication
- Shortening the run time
- Proper burn-in - ✔✔Excessive lubrication
✔✔What is most closely associated with repair of broken parts?
- Preventive maintenance
- Predictive maintenance
, - Breakdown maintenance
- PDCA cycles - ✔✔Breakdown maintenance
✔✔Equipment should be inspected and reported to whom at the start of the production
day?
- The incoming shift
- The auditor
- All personnel
- Appropriate parties - ✔✔Appropriate parties
✔✔Workers should perform an emergency shutdown of their equipment and notify their
supervisor in which of the following circumstances?
- They notice that the equipment temperature is gradually rising but still within allowable
limits.
- They hear a loud banging noise coming from the equipment.
- They detect vibration levels that are within the allowable range.
- They are notified of a family emergency and need to go home. - ✔✔They hear a loud
banging noise coming from the equipment.
✔✔__________ are not permitted on the floor of a workstation.
- Extension cords
- Painted lines
- Trash cans
- Non-slip mats - ✔✔Extension cords
✔✔What is preventive maintenance defined as?
- Condition-based servicing
- Run-to-breakdown production
- Plan-Do-Check-Act (PDCA) cycles
- Routine servicing at predetermined intervals - ✔✔Routine servicing at predetermined
intervals
✔✔The best way to store liquids such as paint or cleaning fluids is __________.
- Sealed and in a cabinet
- On the workbench
- Near a window for ventilation
- Under the workbench for easy access - ✔✔Sealed and in a cabinet
✔✔__________ should be replaced immediately if found to be missing during an
equipment inspection.
- Safety guarding
- Foot rests
- A maintenance report
- A borescope - ✔✔Safety guarding