WALMART - STORMWATER EXAM ACTUAL
QUESTIONS AND 100% CORRECT ANSWERS
Question 1
The stormwater Notice of Intent (NOI) must be submitted
Correct Answer
After the SWPPP is prepared and before starting construction
Question 2
Potential pollutant sources stored on a construction site may include
Correct Answer
Petroleum storage tanks, soil amendments, masonry materials -- all of the above
Question 3
The following must be marked on Site Maps in the jobsite trailer as works progress
Correct Answer
The dates when BMP changes or additions take place
Question 4
Which erosion control best mgmt practice increases water infiltration, dissipates
rainfall energy and slows overland flow of stormwater
Correct Answer
Vegetation
Question 5
The SWPPP implementation sequence may be modified
Correct Answer
After consulting with the project SWPPP designer (CEC) and if required the Project
Engineer
Page 1 of 14
, Question 6
Which of the following information is to be posted at the entrance to the site?
Correct Answer
Construction Site Notice, Permit authorization, Location of the SWPPP -- All of the
above
Question 7
Runoff Controls include all but which one of the following
Correct Answer
Rolled Erosion Control Products
Question 8
Which of the following is never an allowable stormwater discharge from a
construction site?
Correct Answer
Discharge from contaminated groundwater
Question 9
Which of the following is NOT a beneficial use of water?
Correct Answer
Flushing a spill down a storm drain
Question 10
If your site is inspected by US EPA, or another regulatory agency, you should:
Correct Answer
Be Courteous, Attend their inspection, Allow access to site and documentation -- All
of the above
Page 2 of 14
QUESTIONS AND 100% CORRECT ANSWERS
Question 1
The stormwater Notice of Intent (NOI) must be submitted
Correct Answer
After the SWPPP is prepared and before starting construction
Question 2
Potential pollutant sources stored on a construction site may include
Correct Answer
Petroleum storage tanks, soil amendments, masonry materials -- all of the above
Question 3
The following must be marked on Site Maps in the jobsite trailer as works progress
Correct Answer
The dates when BMP changes or additions take place
Question 4
Which erosion control best mgmt practice increases water infiltration, dissipates
rainfall energy and slows overland flow of stormwater
Correct Answer
Vegetation
Question 5
The SWPPP implementation sequence may be modified
Correct Answer
After consulting with the project SWPPP designer (CEC) and if required the Project
Engineer
Page 1 of 14
, Question 6
Which of the following information is to be posted at the entrance to the site?
Correct Answer
Construction Site Notice, Permit authorization, Location of the SWPPP -- All of the
above
Question 7
Runoff Controls include all but which one of the following
Correct Answer
Rolled Erosion Control Products
Question 8
Which of the following is never an allowable stormwater discharge from a
construction site?
Correct Answer
Discharge from contaminated groundwater
Question 9
Which of the following is NOT a beneficial use of water?
Correct Answer
Flushing a spill down a storm drain
Question 10
If your site is inspected by US EPA, or another regulatory agency, you should:
Correct Answer
Be Courteous, Attend their inspection, Allow access to site and documentation -- All
of the above