Cold Load Pick-up is best described as
Give this one a try later!
Load which has been de-energized for some time and has lost its cycling
characteristics
Which of the following entities are eligible to be an Interconnection Time Monitor?
Give this one a try later!
D. Reliability Coordinator
,In order to properly synchronize a generator to the system, which of the following
variables must be monitored to be successful?
Give this one a try later!
A. Voltage, phase angle, and frequency
Frequency Bias, which approximates a Control Area's response to an error in
Interconnection Frequency is measured in:
Give this one a try later!
C. MW/.1 Hz
The DOE form OE-417 must also be filed with the following entities within 24 hours:
Give this one a try later!
D. NERC & RFC or SERC
What is the requested response time for members to reply to a request for SSR data?
Give this one a try later!
A. 10 minutes
,A black start generator must be able to close onto a dead bus with _____ hours of the
requested to start
Give this one a try later!
3 hours
Every generator interconnected with, and synchronized to, PJM transmission system
must have the ability to coordinate with PJM or
Give this one a try later!
C. The Local Control Center (LLC)
A unit (or intermittent facility) will be considered as having passed their capability test
and require no further action if their test results are within ___ of the stated limits
Give this one a try later!
D. 5%
There is/are ____ level(s) of Cross Zonal Coordination
Give this one a try later!
, C. Three
A NERC energy emergency alert can only be issued by a:
Give this one a try later!
RC
Which of the following statements are true concerning the "Bottom-up Multiple
Island" restoration method?
1 - It allows for the restoration of several areas of your system at the same time
2 - Your system should be stable since it will be connected to the Eastern
Interconnection
3 - There will be faster restart of specific generation
4 - There is less stability due to the smaller size of the islands
Give this one a try later!
1,3 and 4
During restoration, the ___ acts as coordinator and disseminator of information related
to generation and transmission availability
Give this one a try later!
C. PJM System Operator
Give this one a try later!
Load which has been de-energized for some time and has lost its cycling
characteristics
Which of the following entities are eligible to be an Interconnection Time Monitor?
Give this one a try later!
D. Reliability Coordinator
,In order to properly synchronize a generator to the system, which of the following
variables must be monitored to be successful?
Give this one a try later!
A. Voltage, phase angle, and frequency
Frequency Bias, which approximates a Control Area's response to an error in
Interconnection Frequency is measured in:
Give this one a try later!
C. MW/.1 Hz
The DOE form OE-417 must also be filed with the following entities within 24 hours:
Give this one a try later!
D. NERC & RFC or SERC
What is the requested response time for members to reply to a request for SSR data?
Give this one a try later!
A. 10 minutes
,A black start generator must be able to close onto a dead bus with _____ hours of the
requested to start
Give this one a try later!
3 hours
Every generator interconnected with, and synchronized to, PJM transmission system
must have the ability to coordinate with PJM or
Give this one a try later!
C. The Local Control Center (LLC)
A unit (or intermittent facility) will be considered as having passed their capability test
and require no further action if their test results are within ___ of the stated limits
Give this one a try later!
D. 5%
There is/are ____ level(s) of Cross Zonal Coordination
Give this one a try later!
, C. Three
A NERC energy emergency alert can only be issued by a:
Give this one a try later!
RC
Which of the following statements are true concerning the "Bottom-up Multiple
Island" restoration method?
1 - It allows for the restoration of several areas of your system at the same time
2 - Your system should be stable since it will be connected to the Eastern
Interconnection
3 - There will be faster restart of specific generation
4 - There is less stability due to the smaller size of the islands
Give this one a try later!
1,3 and 4
During restoration, the ___ acts as coordinator and disseminator of information related
to generation and transmission availability
Give this one a try later!
C. PJM System Operator