CON 1400V QUESTIONS WITH COMPLETE SOLUTIONS
2. A contracting officer may delegate conducting a post-
vc vc vc vc vc vc vc vc
award orientation conference to the administrative
vc vc vc vc vc
contracting officer (ACO). vc vc
a) True
vc
b) False - ans-a
vc vc vcvc
3. Generally, government contracts do not hold contractors liable for loss of government property if the
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc v
property is
c vc
provided under which type of contract?
vc vc vc vc vc
a) Contracts for commercial products and commercial services
vc vc vc vc vc vc vc
b) Contracts with educational institutions
vc vc vc vc
c) Cost-reimbursement contracts
vc vc
d) Contracts that do not exceed the Simplified Acquisition Threshold (SAT) - ans-c
vc vc vc vc vc vc vc vc vc vc vc vcvc
5. What part of the Federal Acquisition Regulation (FAR) identifies the required contract file document
vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ation?
a) FAR 4.804
vc vc
b) FAR 4.803
vc vc
c) FAR 4.7
vc vc
d) FAR 4.6 - ans-b
vc vc vc vcvc
6. When must a contractor maintain an approved property management system and be monitored by a
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
government
vc
property representative? vc
a) Never
vc
b) Always
vc
c) If the contractor has failed an audit
vc vc vc vc vc vc vc
d) If the contractor has been provided government furnished property - ans-d
vc vc vc vc vc vc vc vc vc vc vcvc
7. What process is described in the following statement?
vc vc vc vc vc vc vc vc
Using the technical specifications, COR, or in plant QAS
vc vc vc vc vc vc vc vc vc
inspects to ensure supplies/services meet contract requirements.
vc vc vc vc vc vc
a) Government quality assurance
vc vc vc
b) Contract performance
vc vc
c) Government acceptance
vc vc
d) Contractor invoice review - ans-a
vc vc vc vc vcvc
8. What contractor system includes expediting delivery of materials?
vc vc vc vc vc vc vc vc
a) Purchasing system
vc vc
b) Material management and accounting system
vc vc vc vc vc
c) Accounting system
vc vc
d) Delivery management system - ans-a
vc vc vc vc vcvc
, 9. A contractor is allowed to rebut any part of their performance report in the Contractor Performance A
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ssessment
Reporting System (CPARS) report once the government has finalized and submitted the report.
vc vc vc vc vc vc vc vc vc vc vc vc
a) True
vc
b) False - ans-b
vc vc vcvc
10. Which statement is accurate regarding contractor submission of cost data?
vc vc vc vc vc vc vc vc vc vc
a) It is required when modifying a contract or subcontract for commercial products or commercial servi
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ces
b) It is required when a waiver has been granted
vc vc vc vc vc vc vc vc vc
c) it is required for a modification or negotiated or sealed-
vc vc vc vc vc vc vc vc vc vc
bid contract involving a price adjustment or more than two
vc vc vc vc vc vc vc vc vc
million dollars vc
d) It is required if the contracting officer determines that prices agreed upon are based on adequate pri
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ce competition - ans-c
vc vc vcvc
11. What is considered government-furnished property?
vc vc vc vc vc
a) Intellectual property
vc vc
b) Items considered incidental to the place of performance
vc vc vc vc vc vc vc vc
c) Material, equipment, and special tooling
vc vc vc vc vc
d) Software - ans-c
vc vc vcvc
12. What term is defined by this statement?
vc vc vc vc vc vc vc
The technical requirements in the contract relating to the quality of the
vc vc vc vc vc vc vc vc vc vc vc vc
product or service and those contract clauses prescribing inspection, and other quality controls incumb
vc vc vc vc vc vc vc vc vc vc vc vc vc
ent on the vc vc
contractor, to assure that the product or service conforms to the contractual requirements.
vc vc vc vc vc vc vc vc vc vc vc vc
a) Contractor performance
vc vc
b) Inspection
vc
c) Contract quality requirements
vc vc vc
d) Risk mitigation - ans-c
vc vc vc vcvc
13. What must be managed to ensure successful contract completion?
vc vc vc vc vc vc vc vc vc
a) Cost, schedule, and performance
vc vc vc vc
b) Surveillance of quantity contract requirements
vc vc vc vc vc
c) Prevention of defects
vc vc vc
d) Surveillance of how a process is performed or how a product is made - ans-a
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vcvc
14. According to FAR part 46, acceptance means the act of an authorized representative of the govern
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ment by which vc vc
the government, for itself or as agent of another, assumes ownership of existing identified supplies ten
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
dered or vc
approves specific services rendered as partial or complete performance of the contract.
vc vc vc vc vc vc vc vc vc vc vc
a) True
vc
b) False - ans-a
vc vc vcvc
15. What part of the FAR is critical in managing contract quality?
vc vc vc vc vc vc vc vc vc vc vc
a) FAR part 33 prescribes policies and procedures for filing protests and for processing contract disput
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
es andvc
2. A contracting officer may delegate conducting a post-
vc vc vc vc vc vc vc vc
award orientation conference to the administrative
vc vc vc vc vc
contracting officer (ACO). vc vc
a) True
vc
b) False - ans-a
vc vc vcvc
3. Generally, government contracts do not hold contractors liable for loss of government property if the
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc v
property is
c vc
provided under which type of contract?
vc vc vc vc vc
a) Contracts for commercial products and commercial services
vc vc vc vc vc vc vc
b) Contracts with educational institutions
vc vc vc vc
c) Cost-reimbursement contracts
vc vc
d) Contracts that do not exceed the Simplified Acquisition Threshold (SAT) - ans-c
vc vc vc vc vc vc vc vc vc vc vc vcvc
5. What part of the Federal Acquisition Regulation (FAR) identifies the required contract file document
vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ation?
a) FAR 4.804
vc vc
b) FAR 4.803
vc vc
c) FAR 4.7
vc vc
d) FAR 4.6 - ans-b
vc vc vc vcvc
6. When must a contractor maintain an approved property management system and be monitored by a
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
government
vc
property representative? vc
a) Never
vc
b) Always
vc
c) If the contractor has failed an audit
vc vc vc vc vc vc vc
d) If the contractor has been provided government furnished property - ans-d
vc vc vc vc vc vc vc vc vc vc vcvc
7. What process is described in the following statement?
vc vc vc vc vc vc vc vc
Using the technical specifications, COR, or in plant QAS
vc vc vc vc vc vc vc vc vc
inspects to ensure supplies/services meet contract requirements.
vc vc vc vc vc vc
a) Government quality assurance
vc vc vc
b) Contract performance
vc vc
c) Government acceptance
vc vc
d) Contractor invoice review - ans-a
vc vc vc vc vcvc
8. What contractor system includes expediting delivery of materials?
vc vc vc vc vc vc vc vc
a) Purchasing system
vc vc
b) Material management and accounting system
vc vc vc vc vc
c) Accounting system
vc vc
d) Delivery management system - ans-a
vc vc vc vc vcvc
, 9. A contractor is allowed to rebut any part of their performance report in the Contractor Performance A
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ssessment
Reporting System (CPARS) report once the government has finalized and submitted the report.
vc vc vc vc vc vc vc vc vc vc vc vc
a) True
vc
b) False - ans-b
vc vc vcvc
10. Which statement is accurate regarding contractor submission of cost data?
vc vc vc vc vc vc vc vc vc vc
a) It is required when modifying a contract or subcontract for commercial products or commercial servi
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ces
b) It is required when a waiver has been granted
vc vc vc vc vc vc vc vc vc
c) it is required for a modification or negotiated or sealed-
vc vc vc vc vc vc vc vc vc vc
bid contract involving a price adjustment or more than two
vc vc vc vc vc vc vc vc vc
million dollars vc
d) It is required if the contracting officer determines that prices agreed upon are based on adequate pri
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ce competition - ans-c
vc vc vcvc
11. What is considered government-furnished property?
vc vc vc vc vc
a) Intellectual property
vc vc
b) Items considered incidental to the place of performance
vc vc vc vc vc vc vc vc
c) Material, equipment, and special tooling
vc vc vc vc vc
d) Software - ans-c
vc vc vcvc
12. What term is defined by this statement?
vc vc vc vc vc vc vc
The technical requirements in the contract relating to the quality of the
vc vc vc vc vc vc vc vc vc vc vc vc
product or service and those contract clauses prescribing inspection, and other quality controls incumb
vc vc vc vc vc vc vc vc vc vc vc vc vc
ent on the vc vc
contractor, to assure that the product or service conforms to the contractual requirements.
vc vc vc vc vc vc vc vc vc vc vc vc
a) Contractor performance
vc vc
b) Inspection
vc
c) Contract quality requirements
vc vc vc
d) Risk mitigation - ans-c
vc vc vc vcvc
13. What must be managed to ensure successful contract completion?
vc vc vc vc vc vc vc vc vc
a) Cost, schedule, and performance
vc vc vc vc
b) Surveillance of quantity contract requirements
vc vc vc vc vc
c) Prevention of defects
vc vc vc
d) Surveillance of how a process is performed or how a product is made - ans-a
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vcvc
14. According to FAR part 46, acceptance means the act of an authorized representative of the govern
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
ment by which vc vc
the government, for itself or as agent of another, assumes ownership of existing identified supplies ten
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
dered or vc
approves specific services rendered as partial or complete performance of the contract.
vc vc vc vc vc vc vc vc vc vc vc
a) True
vc
b) False - ans-a
vc vc vcvc
15. What part of the FAR is critical in managing contract quality?
vc vc vc vc vc vc vc vc vc vc vc
a) FAR part 33 prescribes policies and procedures for filing protests and for processing contract disput
vc vc vc vc vc vc vc vc vc vc vc vc vc vc vc
es andvc