NETA III Exam Questions with Complete Solutions

Document preview thumbnail
Vista previa 3 fuera de 28 páginas

NETA III Exam Questions with Complete Solutions

Vista previa del contenido

NETA III Exam Questions with
Complete Solutions28

The alternate source for emergency systems are required to be equipped with ground-fault
protection of equipment. - ANSWERS-False



Which ANSI/IEEE standard covers SF6 circuit breakers? - ANSWERS-C37.04



You measure the winding resistance of a 12.4kV, 1000kVA, Delta-Delta connected transformer
with a 100A test set. H1-H2 measures 42.0 microhms, H2-H3 measures 41.9 microhms, and H3-
H1 measures 84.0 microhms. What can you conclude from these readings? - ANSWERS-One
phase of the transformer is open.



When monitoring for entries involving a decent into atmospheres that may be stratisfied, the
envelope should be tested at a distance of approximately _____ feet in the direction of travel
and to each side. - ANSWERS-4



The transformer manufacturer should be consulted if winding-resistance test values vary by
more than _____ percent from factory test values or between adjacent phases according to
NETA acceptance testing standards. - ANSWERS-2



A DC shunt motor should never be operated: - ANSWERS-with the field circuit open



What is the expected torque (pound-feet) value of a 3/8" Grade 5 bolt? - ANSWERS-20



The generally accepted limits of deviation from the nominal 60Hz utility power frequency is: -
ANSWERS-.50Hz

,Power Factor testing is least effective on which of the following? - ANSWERS-MV Cable



Which of the following insulating liquid tests is optional when maintenance testing a 13.2kV-
4.16kV 1500kVA transformer with silicone fluid per NETA standards? - ANSWERS-ASTM D1298



Panelboards equipped with snap switches of rating 30 amps or less shall be provided with over-
current protection of not more than _____ . - ANSWERS-200 amps



Underground service conductors between the terminals of service equipment and service
lateral or underground service conductors are termed as _____ . - ANSWERS-Service Entrance
Conductors



What is a dual element fuse used for? - ANSWERS-Operate with a temporary overload



The full-load current for a single-phase alternating current 115 volt, 1 horsepower motor is
which of the following: - ANSWERS-16 A



Infrared surveys should be performed during periods of maximum possible loading but not less
than _____ % of rated load of the electrical equipment being inspected. - ANSWERS-40



Decreasing the opening time of the overcurrent protective device will decrease Arc-Flash
hazards. - ANSWERS-true



In a wye connected system, without neutral grounding, zero sequence currents are: - ANSWERS-
zero



When evaluating insulation test results on a medium-voltage, air-magnetic circuit breaker, what
quantity is evaluated? - ANSWERS-watts-loss

, In accordance with NETA and IEEE standards, the correct acceptance test voltage (dc) for 35KV
rated EPR 133% insulation level cable is? - ANSWERS-124kV



Calculate the circuit time constant of an inductor having resistance value of 100 ohms and an
inductance value of 4 Henry: - ANSWERS-0.04 sec

T=L/R



Transformer polarity: - ANSWERS-Is of concern when multiple sets of primary and secondary
windings are interconnected



Identify the least reliable power system arrangement: - ANSWERS-Radial w/ Primary Selectivity



The hot collar bushing test should be performed using which of the following test modes? -
ANSWERS-UST

GST

GST-g



R rated fuses are used for: - ANSWERS-Protection for motors

R-rated fuses provide required short-circuit protection for medium voltage motors, motor
controllers and associated circuitry. Relays provide both overload protection and locked rotor
protection to the motor.



Which of the following would be a factor in choosing between 100%, 133%, and 173% Medium
voltage cable for a power system? - ANSWERS-Ground Fault protection



During the performance of a thermographic scan of similar components within the switchboard
that are under similar load, at what temperature difference does NETA recommend
investigation? - ANSWERS-1-3 deg C

Información del documento

Subido en
3 de julio de 2026
Número de páginas
28
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$15.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ETHANSMILE
4.1
(40)
Vendido
167
Seguidores
104
Artículos
2607
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes