FLORIDA CERTIFIED GENERAL CONTRACTOR – CONTRACT ADMINISTRATION PRACTICE EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A | INSTANT DOWNLOAD PDF.

Puntuación
-
Vendido
-
Páginas
30
Grado
A+
Subido en
02-07-2026
Escrito en
2025/2026

FLORIDA CERTIFIED GENERAL CONTRACTOR – CONTRACT ADMINISTRATION PRACTICE EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A | INSTANT DOWNLOAD PDF.

Institución
3x@m
Grado
3x@m

Vista previa del contenido

FLORIDA CERTIFIED GENERAL CONTRACTOR – CONTRACT ADMINISTRATION PRACTICE EXAM
QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A |
INSTANT DOWNLOAD PDF.



Core Domains
* Bidding and Estimating
* Contract Law and Obligations
* Construction Lien Law
* Project Scheduling and Management
* Risk Management and Insurance
* Occupational Safety and Health
* Florida Building Code Compliance
* Business Finance and Accounting

Introduction
*The purpose of this examination is to evaluate the technical competence and professional knowledge of

Section One: Questions 1–100
 




Under Florida Statute Chapter 713, what is the deadline for a contractor to record a Claim of Lien
after final furnishing of labor or materials?
A. 30 days
B. 60 days

,🟢 C. 90 days
D. 120 days
🔴 RATIONALE: Florida construction lien law requires that a Claim of Lien be recorded no later
than 90 days after the final furnishing of labor, services, or materials to the project site.
Which type of insurance policy provides coverage for the contractor against claims of bodily injury or
property damage arising out of the contractor's operations?
🟢 A. Commercial General Liability (CGL)
B. Workers' Compensation
C. Builder's Risk
D. Professional Liability
🔴 RATIONALE: Commercial General Liability insurance is designed to protect the business from
third-party claims involving bodily injury or property damage.
A contractor discovers a discrepancy between the architectural plans and the structural
specifications. What is the most appropriate initial action?
A. Proceed with the more stringent requirement
B. Proceed with the cheaper option to save costs
🟢 C. Submit a Request for Information (RFI) to the design professional
D. Ask the subcontractor to make the decision
🔴 RATIONALE: When discrepancies occur in contract documents, the contractor must seek formal
clarification from the architect or engineer of record via an RFI to avoid liability.
If a contract contains a "Time is of the Essence" clause, what does this imply regarding the project
schedule?
A. Delays are permitted if weather is poor
🟢 B. Any failure to complete on time is a material breach of contract
C. Substantial completion is optional

, D. The owner is responsible for all scheduling delays
🔴 RATIONALE: This clause indicates that timely performance is a critical element of the contract,
and failure to meet the schedule constitutes a serious breach.
Which bond guarantees that the contractor will complete the project according to the contract
terms?
A. Bid bond
🟢 B. Performance bond
C. Payment bond
D. Maintenance bond
🔴 RATIONALE: A performance bond ensures the project owner that the contractor will fulfill their
contractual obligations and complete the work as specified.
What is the primary purpose of a Notice to Owner (NTO) in Florida?
A. To notify the owner that the project is complete
B. To request a progress payment
🟢 C. To preserve lien rights for those not in privity with the owner
D. To terminate a contract
🔴 RATIONALE: The NTO alerts the property owner that a party not in direct privity of contract is
performing work and may have the right to place a lien on the property if unpaid.
When utilizing the Critical Path Method (CPM), what does "float" represent?
A. The total cost of the project
B. The number of workers assigned to a task
🟢 C. The amount of time an activity can be delayed without delaying the project finish date
D. The time required for permit approval
🔴 RATIONALE: Float (or slack) is the flexibility in a schedule; it is the time a specific task can be
delayed before it impacts the overall project completion date.

Escuela, estudio y materia

Institución
3x@m
Grado
3x@m

Información del documento

Subido en
2 de julio de 2026
Número de páginas
30
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$25.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
tutorcase
1.0
(1)

Conoce al vendedor

Seller avatar
tutorcase For state PCS, UPSC, UGC NET
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2
Miembro desde
1 mes
Número de seguidores
0
Documentos
818
Última venta
1 semana hace

1.0

1 reseñas

5
0
4
0
3
0
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes