Adhesive Anchor Training Complete Exam Study Questions with 100% Correct Answers | Brand New Version 1. An adhesive anchor system is made up of an: - ANSWER adhesive, anchor, drilling equipment, cleaning equipment, installation equipment, MPII, and MSDS 2. An anchor connection includes an attachment, an anchor, and the substrate (T/F) - ANSWER True 3. Adhesive anchors are cast in concrete before the concrete hardens (T/F) - ANSWER False 4. What piece of equipment has a static mixing element? - ANSWER Mixing nozzle 5. If reinforcement is contacted during the drilling process, you should: - ANSWER Notify your supervisor 6. The end of the drill bit that is secured in the drill by the chuck is called the: - ANSWER Shank 7. The tip of a drill bit is often made of hardened materials such as carbide or diamond to drill into the concrete (T/F) - ANSWER True 8. A layer of dust in the drilled hole can (?) adhesive bond to the concrete - ANSWER Reduce 9. The condition of the concrete will have more influence on the adhesive bond strength than the air temperature (T/F) - ANSWER True 10. For guidance on the cleaning techniques to be used, the installer should check the: - ANSWER MPII 11. Cleaning procedures for all adhesive anchor products will be the same (T/F) - ANSWER False 12. Check the MPII to select the recommended brush size for hole cleaning. Check that the brush is not too worn by inserting it into the hole if it (?) than it's the right size - ANSWER Resists insertion 13. The stiff metal or nylon brushes used to clean a hole should be: - ANSWER Full, straight, clean, and free of dirt and other contaminants 14. ACI 318-11 requires a minimum concrete age of 21 days for installation of adhesive anchors (T/F) - ANSWER True 15. Hole cleaning equipment for a dry installation can include: - ANSWER Brushes and oil-free compressed air 16. Most MPII cleaning instructions include brushing and blowing techniques often referred to as (?), to properly remove drill dust from the hole - ANSWER Blow-brush-blow 17. The length of brushes and the end of an air nozzle should be checked to be sure they can reach into the deepest part of the hole (T/F) - ANSWER True 18. All adhesives for adhesive anchor installation have the same fresh and hardened properties (T/F) - ANSWER False 19. Storage of adhesives should be done in accordance with the MPII, they should be stored in a (?) , well ventilated storage location - ANSWER Cool, dry, and dark 20. Before using an adhesive check the (?) date to ensure that the product performance will be at its fullest capacity - ANSWER Expiration 21. The (?) is where the two adhesive components from a cartridge flow into the mixing nozzle - ANSWER Manifold 22. The only part of in an adhesive anchor system that is allowed to be modified is the: - ANSWER Extension tube 23. Adhesive anchor failure in tension does NOT occur by: - ANSWER Concrete pry out failure 24. Adhesive anchor failure modes in shear include: - ANSWER Concrete pry out failure, steel failure, and concrete breakout failure 25. Installation factors that influence the strength of the adhesive anchor bond include: - ANSWER Drilling the hole, cleaning the hole, and injecting the adhesive according to the MPII 26. Adhesives should be stored: - ANSWER As directed by the MPII 27. Gel time is: - ANSWER The amount of time between first mixing and when it becomes non-flowing, increased when temps decrease, and decrease when temps increase 28. Proper installation of adhesive anchor systems is important to ensure that the system achieves its maximum performance to prevent anchor failures (T/F) - ANSWER True 29. ACI (?), Appendix D requires that installation of adhesive anchors horizon. or overhead that support sustained tension loads are performed by certified personnel - ANSWER 318 30. A post installed anchor is: - ANSWER installed in an existing concrete member 31. A tension load is (?) to the axis of the installed anchor - ANSWER Parallel 32. An adhesive anchor may fail if the applied load exceeds the strength of the bond between the adhesive and the concrete or the bond between the adhesive and the anchor (T/F) - ANSWER True 33. An anchor can also be called: - ANSWER anchor element, anchor rod, threaded rod, and anchoring element 34. Rigorous testing and evaluation requirements for adhesive anchor systems are detailed in ACI (?) - ANSWER 355.4

Vista previa del contenido

Adhesive Anchor Training Complete Exam
Study Questions with 100% Correct
Answers | Brand New Version

1. An adhesive anchor system is made up of an: - ANSWER adhesive, anchor,
drilling equipment, cleaning equipment, installation equipment, MPII, and
MSDS


2. An anchor connection includes an attachment, an anchor, and the substrate
(T/F) - ANSWER True


3. Adhesive anchors are cast in concrete before the concrete hardens (T/F) -
ANSWER False


4. What piece of equipment has a static mixing element? - ANSWER Mixing
nozzle


5. If reinforcement is contacted during the drilling process, you should: -
ANSWER Notify your supervisor


6. The end of the drill bit that is secured in the drill by the chuck is called the: -
ANSWER Shank


7. The tip of a drill bit is often made of hardened materials such as carbide or
diamond to drill into the concrete (T/F) - ANSWER True

,8. A layer of dust in the drilled hole can (?) adhesive bond to the concrete -
ANSWER Reduce


9. The condition of the concrete will have more influence on the adhesive bond
strength than the air temperature (T/F) - ANSWER True


10.For guidance on the cleaning techniques to be used, the installer should
check the: - ANSWER MPII


11.Cleaning procedures for all adhesive anchor products will be the same (T/F)
- ANSWER False


12.Check the MPII to select the recommended brush size for hole cleaning.
Check that the brush is not too worn by inserting it into the hole if it (?) than
it's the right size - ANSWER Resists insertion


13.The stiff metal or nylon brushes used to clean a hole should be: - ANSWER
Full, straight, clean, and free of dirt and other contaminants


14.ACI 318-11 requires a minimum concrete age of 21 days for installation of
adhesive anchors (T/F) - ANSWER True


15.Hole cleaning equipment for a dry installation can include: - ANSWER
Brushes and oil-free compressed air


16.Most MPII cleaning instructions include brushing and blowing techniques
often referred to as (?), to properly remove drill dust from the hole -
ANSWER Blow-brush-blow

,17.The length of brushes and the end of an air nozzle should be checked to be
sure they can reach into the deepest part of the hole (T/F) - ANSWER True


18.All adhesives for adhesive anchor installation have the same fresh and
hardened properties (T/F) - ANSWER False


19.Storage of adhesives should be done in accordance with the MPII, they
should be stored in a (?) , well ventilated storage location - ANSWER Cool,
dry, and dark


20.Before using an adhesive check the (?) date to ensure that the product
performance will be at its fullest capacity - ANSWER Expiration


21.The (?) is where the two adhesive components from a cartridge flow into the
mixing nozzle - ANSWER Manifold


22.The only part of in an adhesive anchor system that is allowed to be modified
is the: - ANSWER Extension tube


23.Adhesive anchor failure in tension does NOT occur by: - ANSWER
Concrete pry out failure


24.Adhesive anchor failure modes in shear include: - ANSWER Concrete pry
out failure, steel failure, and concrete breakout failure


25.Installation factors that influence the strength of the adhesive anchor bond
include: - ANSWER Drilling the hole, cleaning the hole, and injecting the
adhesive according to the MPII

, 26.Adhesives should be stored: - ANSWER As directed by the MPII


27.Gel time is: - ANSWER The amount of time between first mixing and when
it becomes non-flowing, increased when temps decrease, and decrease when
temps increase


28.Proper installation of adhesive anchor systems is important to ensure that the
system achieves its maximum performance to prevent anchor failures (T/F) -
ANSWER True


29.ACI (?), Appendix D requires that installation of adhesive anchors horizon.
or overhead that support sustained tension loads are performed by certified
personnel - ANSWER 318


30.A post installed anchor is: - ANSWER installed in an existing concrete
member


31.A tension load is (?) to the axis of the installed anchor - ANSWER Parallel


32.An adhesive anchor may fail if the applied load exceeds the strength of the
bond between the adhesive and the concrete or the bond between the
adhesive and the anchor (T/F) - ANSWER True


33.An anchor can also be called: - ANSWER anchor element, anchor rod,
threaded rod, and anchoring element


34.Rigorous testing and evaluation requirements for adhesive anchor systems
are detailed in ACI (?) - ANSWER 355.4

Información del documento

Subido en
28 de junio de 2026
Número de páginas
33
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
5
Seguidores
0
Artículos
894
Última venta
2 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes