Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

AETC SWE Exam with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+ (Just Released)

Puntuación
-
Vendido
-
Páginas
30
Grado
A+
Subido en
27-06-2026
Escrito en
2025/2026

AETC SWE Exam with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+ (Just Released)

Institución
Aetc
Grado
Aetc

Vista previa del contenido

AETC SWE Exam with all Correct & 100% Verified Answers |
Actual Complete Exam |Already Graded A+ (Just Released)

What is the electrolyte solution composed of in a NICAD battery? ✔Correct Answer-30%
Potassium Hydroxide
70% Distilled Water
AET2 Prac Guide-shop maint

In a NICAD battery what are the plates composed of? ✔Correct Answer-Specially
manufactured porous nickel plates
AET2 Prac Guide-shop maint

What can be used to neutralize large spills of battery electrolyte? ✔Correct Answer-most
common is a vinegar/ water solution- 1qt/1 gal or
5% boric acid solution or
citrus
AET2 Prac guide- shop maint

The ACCB forwards a recommendation on all standard aircraft configuration changes for final
review to whom? ✔Correct Answer-Commandant CG-711 Chief, Office of Aviation Forces and
Commandant CG-41 Chief, Office of Aeronautical Engineering
PG-85-00-70

ACCB review is not required when? ✔Correct Answer-A TCTO/SCTO is for inspection purposes
only or
A TCTO/SCTO is a revision to an existing approved TCTO/SCTO and no major changes have been
made.
PG-85-00-70

What is the process guide for the Aircraft Configuration Control Board ( ACCB) ? ✔Correct
Answer-CGTO PG-85-00-70

No aircraft modifications will be made without specific authorization from whom? ✔Correct
Answer-Commandant CG-711
PG-85-00-70

Who will provide policy guidance for the corrosion prevention and control program?
✔Correct Answer-Commandant CG 41
PG-85-00-60

A message TCTO released after working hours without a number assigned by ALC ESD TPB
would look like what? ✔Correct Answer-HH-60 T25XXX

,TPB will be notified the next business day that the message was sent. The TPB tech writer will
assign a number and advise the ACMS maintenace analyst.
PG-85-00-40

What is the breakdown of a TCTO number? ✔Correct Answer-T34101
Always a T ACMS code for TCTO
34 is the ATA chapter or S1000D chapter
the rest is the sequential TO number within ATA-100 category or S1000D category
PG-85-00-40

What Mode 3 code are USCG aircraft authorized to squak during SAR operations? ✔Correct
Answer-Code 1277
3710.1f

Quality Assurance inspectors shall be selected and designated in writng by whom? ✔Correct
Answer-Engineering Officer
PG-85-00-110 1-1

Who may authorize a collateral duty QA inspector to sign off grounding discrepancies and flight
control work? ✔Correct Answer-Can be approved by any supervisor possessing maintenance
release authority
PG-85-00-110 1-1

Who provides funds directly to DOD for USCG participation in the JOAP program? ✔Correct
Answer-CG-41
PG-85-00-110 1-3

What does SOAP stand for? ✔Correct Answer-Spectrometric Oil Analysis Program
PG-85-00-110 1-3

What T.O. is the primary directive for USCG involvement in the JOAP program? ✔Correct
Answer-NAVAIR 17-15-50.1
PG 85-00-110 1-3

What does RCM stand for? What does it do? What is the PG number? ✔Correct Answer-
Reliability Centered Maintenance
Monitors the performance of equipment and brings attention to management of deteriorating
trends. PG-85-00-30
PG-85-00-110 1-4

What is a CAMI? ✔Correct Answer-Continuing Action Maintenance Instruction
used when a directive or situation dictates specific work must be performed at recurring
intervals or upon occurence of a particular condition or incident.
PG-85-00-110 1-8

, What is a TIMI? ✔Correct Answer-Technical Information Maintenance Instruction
directive or situation requires that technical info be promulgated within an activity.
PG-85-00-110 1-8

What is a SAMI? ✔Correct Answer-Single Action Maintenance Instruction
used when a directive or situation dictates that specific work must be performed on a one time
basis.
PG-85-00-110 1-8

What is required for each new or modified airborne COMSEC installation? ✔Correct Answer-
TEMPEST Certification
This includes initial installation, reinstallation after modification or after modification of
associated wiring.
PG-85-00-110 1-7

What is the USCG TEMPEST program? Who will oversee it? ✔Correct Answer-The
investigation and study of compromising emanations.
CG-41
PG-85-00-110 1-6

Who is responsible for ensuring an effective calibration program is implemented for assigned
equipment and tooling? How is it tracked? ✔Correct Answer-the CO
ACMS Special Requirements or calibration facility tracking list
PG-85-00-110 1-6

What is the normal level of Fuel System Icing Inhibitor in turbine fuel? What is the Mil Spec #?
✔Correct Answer-0.10-0.15% by volume
MIL-DTL-85470B
this additive will lower the flash point of JP-4 by 4degrees and inhibit growth of bacteria
PG-85-00-110 1-5

When a maintenance instruction is canceled how long will it be filed? ✔Correct Answer-6
months
PG-85-00-110 1-8

What manual addresses the aviation tool control program and provides guidance for the
purchase of tools from commercial sources? ✔Correct Answer-COMDTINST M4400.19
Supply Policies and Procedures Manual
PG-85-00-110 1-9

Aviation tools will be of such quality that they meet or exceed what standard? ✔Correct
Answer-(SAE) Society of Automotive Engineers
Aerospace Standards (AS-954, AS-4167)

Escuela, estudio y materia

Institución
Aetc
Grado
Aetc

Información del documento

Subido en
27 de junio de 2026
Número de páginas
30
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$22.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Stuvia2026 Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
24
Miembro desde
1 año
Número de seguidores
1
Documentos
5748
Última venta
2 semanas hace
\"Your trusted Hub for Academic Excellence\"

Stuvia 2024 is your trusted destination for top-tier study materials, including high-quality exams, assignments, and verified answer keys. Our content is crafted for excellence thorough, up-to-date, and tailored to help students succeed in their academic journey. Whether you\'re preparing for a final exam or need support with coursework, every document in our store is designed to provide clarity, accuracy, and confidence. At Stuvia 2024, academic success starts with the right resources.

Lee mas Leer menos
2.3

3 reseñas

5
0
4
0
3
2
2
0
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes