The process by which a building project is delivered to its owner may be divided into five
phases, referred to as project delivery phases. - Answer True
After an area has been coordinated and signed off, if any trade has to move due to another
trade not being in their coordinated location, the trade in the wrong either has to move or take
on the cost of the other trade(s) having to re-coordinate their system to fit. - Answer True
It is unnecessary to refer back and forth among multiple plans and the specifications to
understand the full scope of a project's design and installation. - Answer False
Wicks Laws applies to_________ work - Answer Public Work
During the________ phase, the owner or owner's team defines the project's function, purpose,
scope, size, and budget - Answer Predesign
Plumbing contractor bids include labor costs based on Total Estimate Hours times the - Answer
Blended Rate
In the stage, the design team will develop the overall concept for each system, showing key
ideas of the design solution. - Answer Schematic Design
The vast majority of decisions about products, materials, and equipment are made during
the________stage of the design stage - Answer Design development
In the ________stage of the design phase, the architect and consultants collaborate to work out
the final details of the building and develop the required documentation for submission to the
Authority Having Jurisdiction. - Answer construction document
_______ is a modify command used in autocad - Answer All of the above
A (n)_______ includes the following information architect/engineer/design company name,
owner's name, and project or building number - Answer Title block
, The purpose of a (n)________ is to show the finished appearance of a given side of the building
and furnish vertical heights dimensions - Answer Elevation view
When at the job site, true north can be determined by facing the direction of the sunrise and
then turning __________ degree's to the left - Answer 90
A(n)_________ is a scaled view created by passing a cutting plane through part of a building -
Answer Section view
A (n)______ is used to answer questions that arise due to the lack of design information,
conflicting design information, or coordination issues - Answer RFI
A (n)________ is created and submitted by a contractor after a construction is finished - Answer
As built drawings
A________ is required primarily for the architect and engineer to verify that the correct
products and quantities will be installed on the project in compliance with the design and or
construction documents - Answer Submittal
When reviewing the plans, analyze the existing terrain by reading________ line elevation on the
plans - Answer Contour
When reviewing the MasterFormat specifications start with Div. 01_________ to see if permits
are required or insurance must be obtained prior to the beginning of the job, the notice of work
required, and even the hours that work can take place - Answer General requirements
When reviewing MasterFormat specifications, plumbing-specific information is found in
division_________ - Answer 22
A_________shows elevation in relationship to the physical contour of the land, including
distance berween valves. - Answer Profile
To determine the length of sleeves needed for placement, the_________ must be reviewed to
the reference the type and thickness of the floor - Answer Structural drawings
The ________must be need used to determine center -of-wall to center-of-column lines to
produce measurements for a sleeve layout drawing - Answer Specifications
The______drawing must be reviewed prior to installation to make sure there are no conflicts
with the other mechanical trades' design locations - Answer MEP