●● CQC
Answer: contractor quality control
●● Superpave
Answer: Asphalt mix design system since 1998
●● QCP
Answer: Quality control plan
●● QCM
Answer: Quality control Manual
●● QC
Answer: Quality Control (Contracting Testing and Inspection)
●● VT
Answer: Verification Testing (FDOT or CEI Verification)
,●● CEI
Answer: Construction Engineering and Inspection
●● RT
Answer: Resolution Testing (FDOT)
●● IV
Answer: Independent Verification Testing
●● IA
Answer: Independent Assurance Testing
●● The decision-making authority on a job needs to be given to who?
Answer: Needs to be given to the level closet to the work as specified in
the specifications. It ensure a quick handle on situations and issues.
●● The governing order of project documents from high (1) to low (7)
starts with the highest being
Answer: Special Provisions
●● The governing order of project documents from high to low (2)
Answer: Technical Special Provisions
, ●● The governing order of project documents from high to low (3)
Answer: Plans
●● The governing order of project documents from high to low (4)
Answer: Road design, structures, and traffic operations standards
●● The governing order of project documents from high to low (5)
Answer: Developmental Specifications
●● The governing order of project documents from high to low (6)
Answer: Supplemental Specifications
●● The governing order of project documents from high to low (7)
Answer: Standard Specifications
●● What are the key components in a pre-paving conferences?
Answer: Key Personnel (Paving superintendent)
Contractor Input
Agency Input
QC Plan Review
Discuss more specific key topics or issues
AND CORRECT ANSWERS DETAILED
REVIEW SHEET
●● CQC
Answer: contractor quality control
●● Superpave
Answer: Asphalt mix design system since 1998
●● QCP
Answer: Quality control plan
●● QCM
Answer: Quality control Manual
●● QC
Answer: Quality Control (Contracting Testing and Inspection)
●● VT
Answer: Verification Testing (FDOT or CEI Verification)
,●● CEI
Answer: Construction Engineering and Inspection
●● RT
Answer: Resolution Testing (FDOT)
●● IV
Answer: Independent Verification Testing
●● IA
Answer: Independent Assurance Testing
●● The decision-making authority on a job needs to be given to who?
Answer: Needs to be given to the level closet to the work as specified in
the specifications. It ensure a quick handle on situations and issues.
●● The governing order of project documents from high (1) to low (7)
starts with the highest being
Answer: Special Provisions
●● The governing order of project documents from high to low (2)
Answer: Technical Special Provisions
, ●● The governing order of project documents from high to low (3)
Answer: Plans
●● The governing order of project documents from high to low (4)
Answer: Road design, structures, and traffic operations standards
●● The governing order of project documents from high to low (5)
Answer: Developmental Specifications
●● The governing order of project documents from high to low (6)
Answer: Supplemental Specifications
●● The governing order of project documents from high to low (7)
Answer: Standard Specifications
●● What are the key components in a pre-paving conferences?
Answer: Key Personnel (Paving superintendent)
Contractor Input
Agency Input
QC Plan Review
Discuss more specific key topics or issues