1. An architect is reviewing a project program. Which document most directly
defines spatial requirements and functional relationships?
A. Construction drawings
B. Building code summary
C. Program statement
D. Specifications
Answer: C. Program statement ✔
The program statement establishes space needs, adjacencies, and
functional criteria, guiding early design decisions.
2. During schematic design, which activity is MOST appropriate?
A. Finalizing door hardware schedules
B. Establishing building massing and orientation
C. Writing Division 09 specifications
D. Conducting final inspections
Answer: B. Establishing building massing and orientation ✔
Schematic design focuses on conceptual form, site response, and overall
layout, not detailed specifications.
,3. A client requests a fast-track project delivery. Which method is BEST suited?
A. Design-Bid-Build
B. Construction Manager as Constructor
C. Integrated Project Delivery
D. Lump Sum Contract
Answer: B. Construction Manager as Constructor ✔
CMc allows overlapping design and construction, supporting accelerated
schedules.
4. What is the primary purpose of a geotechnical report?
A. Define zoning setbacks
B. Identify soil conditions and bearing capacity
C. Outline ADA compliance
D. Provide cost estimates
Answer: B. Identify soil conditions and bearing capacity ✔
A geotechnical report informs foundation design and assesses soil stability
and load capacity.
5. Which contract is typically used between owner and architect?
A. A201
B. B101
C. C401
D. G702
Answer: B. B101 ✔
The AIA B101 agreement defines architect services, responsibilities, and
compensation.
6. A site slopes significantly. What design response is MOST appropriate?
A. Ignore slope
B. Use stepped foundations
C. Increase building height only
D. Remove all vegetation
Answer: B. Use stepped foundations ✔
, Stepped foundations adapt to topography, minimizing excavation and
improving stability.
7. What is the architect’s role during bidding?
A. Select contractor unilaterally
B. Interpret contract documents
C. Approves subcontractors only
D. Manage construction means
Answer: B. Interpret contract documents ✔
The architect provides clarifications and ensures bidders understand
drawings and specs.
8. Which factor MOST influences building orientation?
A. Paint color
B. Solar exposure
C. Interior finishes
D. Furniture layout
Answer: B. Solar exposure ✔
Orientation considers sun path, affecting energy efficiency and thermal
comfort.
9. What is a change order?
A. Initial contract
B. Proposal only
C. Modification to contract sum/time
D. Inspection report
Answer: C. Modification to contract sum/time ✔
A change order formally adjusts cost and/or schedule within the contract.
10.Which system BEST resists lateral wind loads in tall buildings?
A. Flat slabs
B. Shear walls
C. Floor finishes
D. Suspended ceilings
, Answer: B. Shear walls ✔
Shear walls provide lateral stability against wind and seismic forces.
11.In programming, adjacency matrices are used to:
A. Calculate costs
B. Define spatial relationships
C. Determine zoning
D. Select materials
Answer: B. Define spatial relationships ✔
Adjacency matrices clarify which spaces should be near or separated.
12.What does LEED primarily evaluate?
A. Structural safety
B. Environmental performance
C. Contract compliance
D. Aesthetic value
Answer: B. Environmental performance ✔
LEED measures sustainability, including energy, water, and materials.
13.Which drawing shows property boundaries and setbacks?
A. Section
B. Site plan
C. Elevation
D. Detail
Answer: B. Site plan ✔
A site plan illustrates boundaries, setbacks, and site features.
14.What is the purpose of specifications?
A. Show dimensions
B. Describe materials and quality
C. Indicate site grading
D. Provide schedules
Answer: B. Describe materials and quality ✔
Specifications define materials, standards, and execution requirements.