Questions and Verified Answers| 100%
Correct| Grade A
Save
Terms in this set (54)
,When should you let your B. After the contract is prepared but before
attorney see a construction you sign it
contract?
A. Before you let the client see
the contract
B. After the contract is prepared
but before you sign it
C. After the building permit is
obtained
D. After the contract is signed by
you and the client
,Which is the most correct B. Contractor's license number
statement as to what must be
included in every home
improvement contract?
A. Notice of right to cancel
B. Contractor's license number
C. Truth-in-lending notice
D. Name of the project
, Which is NOT required on a B. The name and home address of all the
home improvement contract? personnel listed on the license. Know that A,
A. A notice, in at least 10 point C and D are required. Only the contractor's
print, in close proximity to the name, address and license number are
signature, and a statement that required.
the owner has a right to require a
performance and payment bond
B. The name and home address
of all the personnel listed on the
license
C. An approximate date when
work will begin and be
substantially completed
D. A description of the work to be
done and materials and
equipment to be used or
installed