Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 91 páginas
Examen

NEWEST ISO 22301:2019 BUSINESS CONTINUITY MANAGEMENT - LEAD IMPLEMENTER CERTIFICATION EXAM OFFERED BY GAQM | COMPLETE EXAM Q&A WITH RATIONALES

Document preview thumbnail
Vista previa 4 fuera de 91 páginas

NEWEST ISO 22301:2019 BUSINESS CONTINUITY MANAGEMENT - LEAD IMPLEMENTER CERTIFICATION EXAM OFFERED BY GAQM | COMPLETE EXAM Q&A WITH RATIONALES

Vista previa del contenido

NEWEST ISO 22301:2019 BUSINESS
CONTINUITY MANAGEMENT - LEAD
IMPLEMENTER CERTIFICATION EXAM
OFFERED BY GAQM | COMPLETE EXAM Q&A
WITH RATIONALES


1. A multinational logistics company is implementing
ISO 22301 for the first time. During the project
initiation phase, the implementation team has drafted
a scope statement that includes “all freight
forwarding and warehousing operations in the
European region.” However, the team has excluded
the company’s IT service desk, which is shared
globally and used by all regions. The IT service desk
is located in the excluded Asia-Pacific region. Which
of the following statements best reflects the ISO
22301 requirement regarding this exclusion?


A) The scope may exclude the IT service desk
because it is located outside the European region
B) The scope must include the IT service desk
because it is a critical dependency for the in-scope
operations
C) The scope can exclude the IT service desk as long
as it is documented in the business continuity policy

,D) The scope must include all IT functions regardless
of their location
Correct answer: B
Rationale: Clause 4.3 requires the organization to
determine the boundaries and applicability of the
BCMS. When a function is critical to in-scope
products and services, it cannot be arbitrarily
excluded based on geography.


2. An organization has successfully implemented ISO
22301 and has been certified for two years. The
business continuity management system (BCMS) is
stable, and no major incidents have occurred. The
CEO proposes canceling the annual BCMS
management review because “nothing has changed.”
As the Lead Implementer, what is your most
appropriate response?


A) Cancel the meeting but document the reason as
“no changes”
B) Reschedule the meeting to a biennial frequency
C) Explain that Clause 9.3 requires management
reviews at planned intervals, regardless of perceived
stability, to ensure continuing suitability and
effectiveness

,D) Conduct a reduced-scope review focusing only on
changes
Correct answer: C
Rationale: Clause 9.3 (Management review) requires
top management to review the BCMS at planned
intervals. Stability does not eliminate the requirement
to evaluate performance and identify improvement
opportunities.


3. A hospital has completed its business impact
analysis (BIA) and has calculated Recovery Time
Objectives (RTOs) for each critical activity. The
emergency department has an RTO of 2 hours, while
the outpatient pharmacy has an RTO of 5 days. The
hospital is about to invest in a backup generator that
can only support one of the two areas. Which of the
following is the most appropriate justification for
prioritizing the generator for the emergency
department?


A) The outpatient pharmacy has a lower RTO, so it
should be prioritized first
B) The emergency department has a shorter RTO,
indicating a more urgent need for restoration
C) Both activities must be prioritized equally

, D) The generator should support neither area
because all critical activities must be recovered
simultaneously
Correct answer: B
Rationale: RTO is defined in Clause 3.1.29 as the
period following an interruption within which the
activity must be resumed to avoid unacceptable
impacts. Shorter RTOs indicate higher urgency and
should drive resource allocation.


4. A retail chain is conducting its annual BCMS
internal audit. The auditor has sampled three out of
twenty stores and found that each of the sampled
stores had complete and up-to-date business
continuity plans. The quality manager argues that this
proves the entire BCMS is conforming. As the Lead
Implementer, what is your most appropriate position
regarding this sampling approach?


A) The sampling is sufficient if the three stores are
representative of the entire chain
B) The auditor must audit all twenty stores to provide
full assurance
C) The sampling approach is acceptable only if
documented in the audit program and justified by risk
assessment

Información del documento

Subido en
9 de junio de 2026
Número de páginas
91
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$23.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
IsaacRobie
4.0
(78)
Vendido
341
Seguidores
156
Artículos
4368
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes