Construction Document Technologist with correct answers 100% 2026
Construction Document Technologist with correct answers 100% 2026 The phase of the project when the documents first fix the size and character of the entire project, including architectural, structural, mechanical, and electrical systems is during: A. Planning/pre-design. B. Schematic design. C. Design development. D. Construction documents. - Correct Answer C. Design development. Contract forms and General Conditions are best provided by the: A. Owner. B. Architect/Engineer. C. Building official. D. Contractor. - Correct Answer A. Owner. Modifications to Procurement and Contract Documents can be made during which phases of the project? A. Planning and design. B. Design and construction. C. Design and bidding. D. Bidding and construction. - Correct Answer D. Bidding and construction. The Procurement Requirements usually include the following: A. Invitation or Advertisement to Bid, Instructions to Bidders, Information Available to Bidders, Bid Forms and Attachments, and Bid Security Forms. B. Instructions to Bidders, Information Available to Bidders, Bid Forms and Attachments, and Bid Security Forms. C. Instructions to Bidders, Information Available to Bidders, Bid Forms and Attachments, Bid Security Forms, Conditions of the Contract, Specifications, and Drawings. D. All the documents necessary to bid on the project. - Correct Answer A. Invitation or Advertisement to Bid, Instructions to Bidders, Information Available to Bidders, Bid Forms and Attachments, and Bid Security Forms. The document that guarantees the surety will either complete the Contract or provide sufficient funds to do so if the contractor defaults are called a:
Información del documento
- Subido en
- 7 de junio de 2026
- Número de páginas
- 31
- Escrito en
- 2025/2026
- Tipo
- Examen
- Contiene
- Preguntas y respuestas