1
SAFe POPM EXAM – NEWEST 2026 ACTUAL EXAM TEST BANK
45 Real Exam Questions with Correct Verified Answers |
Already Graded A+ (Most Recent!!)
About This Test Bank
This comprehensive test bank contains 45 authentic exam-style questions for the SAFe® 6.0 Product
Owner/Product Manager (POPM) certification exam, based on the latest 2026 syllabus. The actual exam consists
of 45 multiple-choice questions to be completed in 90 minutes (or 120 minutes for non-native English speakers).
A passing score requires approximately 77% (35 of 45) correct answers.
All answers are verified and aligned with the Scaled Agile Framework® and the official SAFe POPM 6.0 Study
Guide (Release Date: May 12, 2026), which includes new topics such as AI-empowered SAFe, crafting AI
prompts, and responsible AI.
Exam Structure:
• 45 multiple-choice, single-select questions
• 4-answer options for each item
• Topics cover Lean-Agile Mindset, SAFe Principles, Roles (PO/PM), PI Planning, Backlog
Management, Continuous Delivery Pipeline, and Metrics
QUESTION 1
According to SAFe, what is the recommended first step of Iteration Planning?
A. Review team capacity
B. Establish capacity
C. Define iteration goals
D. Select stories from the backlog
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : B – Establish Capacity
Explanation: Before selecting stories or defining goals, the team must first
determine its capacity for the iteration. This is done by subtracting non-working
pg. 1
,2
time (vacations, holidays, training, meetings) from each team member‘s available
hours. Once capacity is established, the team can pull stories from the backlog
accordingly.
❌ Why the other options are wrong:
• A (Review team capacity) – Part of the process but “establishing” is the
specific first step.
• C (Define iteration goals) – Occurs after capacity is known and stories are
selected.
• D (Select stories from the backlog) – Happens after capacity is known to
ensure work fits within available time.
</details>
QUESTION 2
What is the main objective of the System Demo in SAFe?
A. Demonstrate completed features to stakeholders for feedback
B. Test the system for bugs
C. Review the team‘s velocity
D. Assign user stories for the next iteration
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : A – Showcase completed features to stakeholders
Explanation: The System Demo is an ART-level event held at the end of each
iteration (or at the end of the PI). Its primary objective is to demonstrate
working, tested features to stakeholders, Product Management, and other ART
members to obtain fast, objective feedback and assess progress toward PI
objectives. It is not a bug-testing session but a showcase of integrated, tested
functionality.
</details>
pg. 2
,3
QUESTION 3
The Product Manager makes weekly visits to a customer‘s site. Which two Agile
Manifesto Values support this behavior? (Choose two.)
A. Working software over comprehensive documentation
B. Customer collaboration over contract negotiation
C. Individual interactions over processes and tools
D. Responding to change over following a plan
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : B – Customer collaboration over contract negotiation, and C –
Individual interactions over processes and tools
Explanation: Weekly customer visits emphasize direct collaboration (value B)
and human interaction (value C). These are the two Agile Manifesto values that
most directly support direct, face-to-face engagement with customers.
</details>
QUESTION 4
Which statement accurately describes the SAFe Backlog Model?
A. Stories are in the ART backlog; features are in the team backlog
B. Features are in the ART backlog; stories are in the team backlog
C. Epics are in the team backlog; features are in the program backlog
D. All items are in a single backlog for the entire ART
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : B – Features are in the ART backlog; stories are in the team backlog
Explanation: In the SAFe backlog model, Features are maintained in the ART
(Program) Backlog and are managed by Product Management. User Stories (and
Enabler Stories) reside in Team Backlogs and are managed by Product Owners.
Epics are maintained at the Portfolio level.
</details>
pg. 3
, 4
QUESTION 5
What is the recommended format for writing User Stories?
A. As a _____ I want _____ so that _____
B. Given _____ when _____ then _____
C. In order to _____ as a _____ I want _____
D. Feature: _____ Benefit: _____
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : A – “As a _____ I want _____ so that _____”
Explanation: The standard format for user stories in SAFe is: “As a [user role], I
want [action/feature] so that [benefit/value].” This format captures the three
critical elements: the user, the need, and the purpose. It helps teams stay
customer-centric and understand the “why” behind the work.
</details>
QUESTION 6
What is the primary goal of Lean-Agile Leaders in supporting Agile Release Trains
(ART)?
A. Assigning tasks to teams
B. Empowering teams to self-organize and make decisions
C. Writing all user stories for the teams
D. Approving every story before it goes into the backlog
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : B – Empowering teams to self-organize and make decisions
Explanation: Lean-Agile Leaders are responsible for creating an environment
where Agile teams have the authority and autonomy to make decisions about
how to do their work. This aligns with SAFe Principle #8 (Unlock the intrinsic
pg. 4
SAFe POPM EXAM – NEWEST 2026 ACTUAL EXAM TEST BANK
45 Real Exam Questions with Correct Verified Answers |
Already Graded A+ (Most Recent!!)
About This Test Bank
This comprehensive test bank contains 45 authentic exam-style questions for the SAFe® 6.0 Product
Owner/Product Manager (POPM) certification exam, based on the latest 2026 syllabus. The actual exam consists
of 45 multiple-choice questions to be completed in 90 minutes (or 120 minutes for non-native English speakers).
A passing score requires approximately 77% (35 of 45) correct answers.
All answers are verified and aligned with the Scaled Agile Framework® and the official SAFe POPM 6.0 Study
Guide (Release Date: May 12, 2026), which includes new topics such as AI-empowered SAFe, crafting AI
prompts, and responsible AI.
Exam Structure:
• 45 multiple-choice, single-select questions
• 4-answer options for each item
• Topics cover Lean-Agile Mindset, SAFe Principles, Roles (PO/PM), PI Planning, Backlog
Management, Continuous Delivery Pipeline, and Metrics
QUESTION 1
According to SAFe, what is the recommended first step of Iteration Planning?
A. Review team capacity
B. Establish capacity
C. Define iteration goals
D. Select stories from the backlog
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : B – Establish Capacity
Explanation: Before selecting stories or defining goals, the team must first
determine its capacity for the iteration. This is done by subtracting non-working
pg. 1
,2
time (vacations, holidays, training, meetings) from each team member‘s available
hours. Once capacity is established, the team can pull stories from the backlog
accordingly.
❌ Why the other options are wrong:
• A (Review team capacity) – Part of the process but “establishing” is the
specific first step.
• C (Define iteration goals) – Occurs after capacity is known and stories are
selected.
• D (Select stories from the backlog) – Happens after capacity is known to
ensure work fits within available time.
</details>
QUESTION 2
What is the main objective of the System Demo in SAFe?
A. Demonstrate completed features to stakeholders for feedback
B. Test the system for bugs
C. Review the team‘s velocity
D. Assign user stories for the next iteration
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : A – Showcase completed features to stakeholders
Explanation: The System Demo is an ART-level event held at the end of each
iteration (or at the end of the PI). Its primary objective is to demonstrate
working, tested features to stakeholders, Product Management, and other ART
members to obtain fast, objective feedback and assess progress toward PI
objectives. It is not a bug-testing session but a showcase of integrated, tested
functionality.
</details>
pg. 2
,3
QUESTION 3
The Product Manager makes weekly visits to a customer‘s site. Which two Agile
Manifesto Values support this behavior? (Choose two.)
A. Working software over comprehensive documentation
B. Customer collaboration over contract negotiation
C. Individual interactions over processes and tools
D. Responding to change over following a plan
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : B – Customer collaboration over contract negotiation, and C –
Individual interactions over processes and tools
Explanation: Weekly customer visits emphasize direct collaboration (value B)
and human interaction (value C). These are the two Agile Manifesto values that
most directly support direct, face-to-face engagement with customers.
</details>
QUESTION 4
Which statement accurately describes the SAFe Backlog Model?
A. Stories are in the ART backlog; features are in the team backlog
B. Features are in the ART backlog; stories are in the team backlog
C. Epics are in the team backlog; features are in the program backlog
D. All items are in a single backlog for the entire ART
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : B – Features are in the ART backlog; stories are in the team backlog
Explanation: In the SAFe backlog model, Features are maintained in the ART
(Program) Backlog and are managed by Product Management. User Stories (and
Enabler Stories) reside in Team Backlogs and are managed by Product Owners.
Epics are maintained at the Portfolio level.
</details>
pg. 3
, 4
QUESTION 5
What is the recommended format for writing User Stories?
A. As a _____ I want _____ so that _____
B. Given _____ when _____ then _____
C. In order to _____ as a _____ I want _____
D. Feature: _____ Benefit: _____
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : A – “As a _____ I want _____ so that _____”
Explanation: The standard format for user stories in SAFe is: “As a [user role], I
want [action/feature] so that [benefit/value].” This format captures the three
critical elements: the user, the need, and the purpose. It helps teams stay
customer-centric and understand the “why” behind the work.
</details>
QUESTION 6
What is the primary goal of Lean-Agile Leaders in supporting Agile Release Trains
(ART)?
A. Assigning tasks to teams
B. Empowering teams to self-organize and make decisions
C. Writing all user stories for the teams
D. Approving every story before it goes into the backlog
<details> <summary>✅ CORRECT ANSWER & RATIONALE</summary>
: Answer : B – Empowering teams to self-organize and make decisions
Explanation: Lean-Agile Leaders are responsible for creating an environment
where Agile teams have the authority and autonomy to make decisions about
how to do their work. This aligns with SAFe Principle #8 (Unlock the intrinsic
pg. 4