◉ A valve positioner is usually recommended as an accessory to a
control valve for which situation described below?.
Answer: For control valves that are experiencing a large degree of
hysteresis
◉ During the troubleshooting process, in addition to safety, the most
important thing to do is:.
Answer: Inform production of the steps you are taking
◉ Before replacing damaged wiring in a 24VDC-powered control
loop, what is the minimum course of action?.
Answer: With the proper personnel protective equipment, pull the
fuse on the level control loop circuit and test for "dead circuit" with a
multi-meter to ensure no voltage is present on the loop before
replacing the wires.
◉ A flow metering device comprised of a body, flow straightener,
hub, bearing, rotor, and pickup is called a:.
Answer: Turbine flowmeter
, ◉ The first step in troubleshooting is to:.
Answer: Verify that something is wrong
◉ Which of the following can provide input/output isolation?.
Answer: Optical coupling
◉ Gases are often oxidized as an energy source in industrial
processes. Special equipment that protects from explosion is known
as:.
Answer: flame safety
◉ If too much reset is used when tuning a control loop:.
Answer: stability will decrease
◉ If, during the check-out phase of a project, a control valve is found
to be constructed of inappropriate material for the process, you
should:.
Answer: mark the loop as incomplete with explanation of valve
problem, return to engineering.
◉ Dead time refers to:.
Answer: the time required for the output to start to change after a
change in its input
Q&A MASTER SOLUTION PACK
◉ A valve positioner is usually recommended as an accessory to a
control valve for which situation described below?.
Answer: For control valves that are experiencing a large degree of
hysteresis
◉ During the troubleshooting process, in addition to safety, the most
important thing to do is:.
Answer: Inform production of the steps you are taking
◉ Before replacing damaged wiring in a 24VDC-powered control
loop, what is the minimum course of action?.
Answer: With the proper personnel protective equipment, pull the
fuse on the level control loop circuit and test for "dead circuit" with a
multi-meter to ensure no voltage is present on the loop before
replacing the wires.
◉ A flow metering device comprised of a body, flow straightener,
hub, bearing, rotor, and pickup is called a:.
Answer: Turbine flowmeter
, ◉ The first step in troubleshooting is to:.
Answer: Verify that something is wrong
◉ Which of the following can provide input/output isolation?.
Answer: Optical coupling
◉ Gases are often oxidized as an energy source in industrial
processes. Special equipment that protects from explosion is known
as:.
Answer: flame safety
◉ If too much reset is used when tuning a control loop:.
Answer: stability will decrease
◉ If, during the check-out phase of a project, a control valve is found
to be constructed of inappropriate material for the process, you
should:.
Answer: mark the loop as incomplete with explanation of valve
problem, return to engineering.
◉ Dead time refers to:.
Answer: the time required for the output to start to change after a
change in its input