Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 28 páginas
Examen

New Mexico General Building Contractor Services – Construction, Renovation & Licensing Guide

Document preview thumbnail
Vista previa 3 fuera de 28 páginas

This content covers the topic of general building contractors in New Mexico, including their roles, services, and typical responsibilities in residential and commercial construction projects. It explains what general contractors do, such as managing construction, renovations, and coordinating subcontractors. It also provides context on licensing requirements, compliance standards, and common service types offered in the construction industry in New Mexico. This overview is useful for clients looking to hire contractors or professionals seeking to understand the construction sector in the state.

Vista previa del contenido

New Mexico General Building Contractor
(GB-98) Practice Exam 100 Questions And
Correct Answers (Verified Answers) Plus
Rationales 2026 Q&A | Instant Download
Pdf



1. What is the main building code adopted for commercial construction
in New Mexico?
A. IRC
B. UBC
C. IBC
D. BOCA
IBC governs commercial buildings under NM Construction Industries
Division.

2. Which trade requires a GB-98 contractor to subcontract with licensed
specialists?
A. Painting
B. Insulation

, C. Electrical
D. Drywall
Electrical work must be performed by a properly licensed EE98
contractor.

3. Who is responsible for verifying jobsite safety compliance?
A. Building officials
B. The contractor
C. Property owner
D. Architect
Contractors must ensure OSHA compliance on-site.

4. A contractor must notify the owner of material substitution that
affects:
A. Paint color
B. Cost or performance
C. Delivery timing only
D. Warranty paperwork only
Material changes impacting cost/functionality must be disclosed.

5. The minimum footing depth in New Mexico must extend below:
A. 6 inches
B. Frost line only
C. Frost line and to stable soil
D. Surface slab
Footings must bear on undisturbed soil below frost depth.

, 6. A change order becomes valid when:
A. Verbal approval from worker
B. Owner receives invoice
C. Both parties sign the change order
D. Contractor completes the work
Written and signed change orders are legally binding.

7. Workers must be trained in fall protection at heights above:
A. 10 ft
B. 6 ft
C. 4 ft
D. 20 ft
OSHA fall protection starts at 6 ft for construction.

8. A building permit is required for:
A. Painting
B. Flooring replacement
C. Structural modifications
D. Minor repairs
Structural changes require permitted review.

9. Which document sets quality standards and installation procedures?
A. Insurance policy
B. Specifications
C. Bid tab

Información del documento

Subido en
1 de mayo de 2026
Número de páginas
28
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Nursescholars
1.5
(2)
Vendido
8
Seguidores
0
Artículos
530
Última venta
3 días hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes