ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||
BRAND NEW
1. DOD relies on a combination of these three entities for the
development of S&T to incorporate -3 legged stool Ans✓✓✓Industry,
DoD, org and universities
1. This center uses a broad charter for the purpose of performing,
analyzing Ans✓✓✓FFRDC
1. CAIV also known as affordability, is about using cost to make these
tradeoffs to keep weapon systems affordable Ans✓✓✓Performance
trade-offs
The AC strategy is based on information from the __ such as functional
areas, range of military Ans✓✓✓ICD
The procurement cost combines these two costs Ans✓✓✓Weapons and
flyaway costs
The adaptive AC frameworks and six pathways are managed by
Ans✓✓✓DoD 5000 series
The purpose of this phase is to develop, build and test a system to verify
that all operation and implied requirements are met Ans✓✓✓EMD
phase
, Scrub budget year to prepare the defensible and detailed BES which
culminates with the the issuance of a resource management decision
Ans✓✓✓Budgeting
This metrics is one of the statutory milestone decision information for a
major capability acquisition program Ans✓✓✓Risk
The MDA of the program has been briefed that a new capability which
has a CDD-V with a technical readiness level assessment of 6
Ans✓✓✓Milestone B
Components develop a POM IAW with the DPG, turns the DPG into
achievable & FYDP Ans✓✓✓Programming
These appropriation categories are needed for a product improvement
programs (PIP) which increase performance system Ans✓✓✓RDT&E,
procurement, O&M
___allows program to make predictions about futures
Ans✓✓✓Escalation and budgeting
Time period that you can use expired funds Ans✓✓✓5 years
When providing a reclama to a proposed program funding the program
Ans✓✓✓Objective and simple language