VIRGINIA HIC COMPLETE STUDY GUIDE 2026 | VERIFIED ANSWERS | GRADED A+ | PASS GUARANTEED What is used to remove air pockets from plain concrete - ANSWER️Vibration What is the allowable MINIMUM specified compressive strength for concrete in foundations NOT exposed to weather? - ANSWER️2,500 psi What is the diameter of number 5 rebar? - ANSWER️5/8 inch. Refer to Figure 1004bu. What is the MAXIMUM width for a footing projection (P)? - ANSWER️The thickness of the footing. In general, what is the MINIMUM concrete covering for steel reinforcement in a footing? - ANSWER️3.0 inches. A concrete block foundation wall that is adequately braced should be cured for a MINIMUM of how much time before backfilling? - ANSWER️48 hours. All of the following are benefits of platform construction as compared to balloon construction EXCEPT - ANSWER️easier installation of plumbing and wiring. What is the MAXIMUM spacing for double floor joists that are separated to allow installation of piping? - ANSWER️4 feet on center. Wall framing is being constructed one floor at a time. What type of wood framing method is being used? - ANSWER️Platform. A jack rafter is face nailed to a hip rafter. The MINIMUM number of 16d common nails that should be used is - ANSWER️three. Where is temporary horizontal bracing attached when erecting trusses? - ANSWER️Near the ridge line of the truss. A third stairway stringer should be used when the stair width exceeds - ANSWER️30 inches What is NOT required in exterior nonbearing walls? - ANSWER️Load-bearing headers. A lengthwise grain separation between or through the growth rings of lumber is called a - ANSWER️shake How MUST rafters be framed to each other? - ANSWER️With a gusset plate. What is the MAXIMUM flame spread index for insulation materials? - ANSWER️25 Flexible (batts) insulation placed in floor joists above an unheated crawl space should - ANSWER️be well supported between joists. Using which of the following would cause the GREATEST increase in the insulation value when re-siding with aluminum? - ANSWER️Perforated reflector foil What is the MAXIMUM distance between a ventilating opening in an under-floor space and each corner of the building? - ANSWER️3 feet What is the MAXIMUM dimension of the ventilation coverings for under-floor space? - ANSWER️1/4 inch. Attic spaces should - ANSWER️be vented for summer heat relief. What is the MINIMUM square footage of net clear opening area for an egress window in a second floor sleeping area? - ANSWER️5.70 square feet. How is the hand of a door determined? - ANSWER️By the location of the hinges when the door is viewed from the inside. Which window type consists of an upper and a lower sash that slide vertically in the side jambs? - ANSWER️Double-hung. What is the MINIMUM overlap for joints in the polyethylene film moisture barrier applied over the exterior of a below grade foundation wall? - ANSWER️6 inches Timing for floating and trowling is critical in producing - ANSWER️A smooth and durable surface Work sites may allow more water to be added to the concrete mixture if - ANSWER️Maintain the slump, without exceeding the allow water - cement ratio What is the minimum requirement for the compressive strength of concrete used in a garage floor in a severe exposure area - ANSWER️3,500 PSI Actual standard size of a concrete block? - ANSWER️7 5/8 x 7 6/8 x 13 5/8 What is the MINIMUM breaking strength required of safety belt lanyards - ANSWER️5,400 pounds What is the MINIMUM clearance that combustible insulation MUST other heat-producing devices - ANSWER️1 inch The escape device for a trench over 4 feet deep MUST be within a MAXIMUM of - ANSWER️25 feet of the worker

Vista previa del contenido

VIRGINIA HIC COMPLETE STUDY GUIDE
2026 | VERIFIED ANSWERS | GRADED A+ |
PASS GUARANTEED



What is used to remove air pockets from plain concrete - ANSWER Vibration


What is the allowable MINIMUM specified compressive strength for concrete in
foundations NOT exposed to weather? - ANSWER 2,500 psi



What is the diameter of number 5 rebar? - ANSWER 5/8 inch.


Refer to Figure 1004bu. What is the MAXIMUM width for a footing projection
(P)? - ANSWER The thickness of the footing.


In general, what is the MINIMUM concrete covering for steel reinforcement in a
footing? - ANSWER 3.0 inches.


A concrete block foundation wall that is adequately braced should be cured for a
MINIMUM of how much time before backfilling? - ANSWER 48 hours.


All of the following are benefits of platform construction as compared to balloon
construction EXCEPT - ANSWER easier installation of plumbing and wiring.

, What is the MAXIMUM spacing for double floor joists that are separated to allow
installation of piping? - ANSWER 4 feet on center.


Wall framing is being constructed one floor at a time. What type of wood framing
method is being used? - ANSWER Platform.


A jack rafter is face nailed to a hip rafter. The MINIMUM number of 16d common
nails that should be used is - ANSWER three.


Where is temporary horizontal bracing attached when erecting trusses? -
ANSWER Near the ridge line of the truss.


A third stairway stringer should be used when the stair width exceeds -
ANSWER 30 inches



What is NOT required in exterior nonbearing walls? - ANSWER Load-bearing
headers.


A lengthwise grain separation between or through the growth rings of lumber is
called a - ANSWER shake


How MUST rafters be framed to each other? - ANSWER With a gusset plate.


What is the MAXIMUM flame spread index for insulation materials? -
ANSWER 25

, Flexible (batts) insulation placed in floor joists above an unheated crawl space
should - ANSWER be well supported between joists.


Using which of the following would cause the GREATEST increase in the
insulation value when re-siding with aluminum? - ANSWER Perforated
reflector foil


What is the MAXIMUM distance between a ventilating opening in an under-floor
space and each corner of the building? - ANSWER 3 feet


What is the MAXIMUM dimension of the ventilation coverings for under-floor
space? - ANSWER 1/4 inch.



Attic spaces should - ANSWER be vented for summer heat relief.


What is the MINIMUM square footage of net clear opening area for an egress
window in a second floor sleeping area? - ANSWER 5.70 square feet.



How is the hand of a door determined? - ANSWER By the location of the
hinges when the door is viewed from the inside.


Which window type consists of an upper and a lower sash that slide vertically in
the side jambs? - ANSWER Double-hung.

, What is the MINIMUM overlap for joints in the polyethylene film moisture
barrier applied over the exterior of a below grade foundation wall? -
ANSWER 6 inches


Timing for floating and trowling is critical in producing - ANSWER A smooth
and durable surface


Work sites may allow more water to be added to the concrete mixture if -
ANSWER Maintain the slump, without exceeding the allow water - cement
ratio


What is the minimum requirement for the compressive strength of concrete used
in a garage floor in a severe exposure area - ANSWER 3,500 PSI



Actual standard size of a concrete block? - ANSWER 7 5/8 x 7 6/8 x 13 5/8


What is the MINIMUM breaking strength required of safety belt lanyards -
ANSWER 5,400 pounds


What is the MINIMUM clearance that combustible insulation MUST other heat-
producing devices - ANSWER 1 inch


The escape device for a trench over 4 feet deep MUST be within a MAXIMUM of
- ANSWER 25 feet of the worker

Información del documento

Subido en
1 de abril de 2026
Número de páginas
46
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
4
Seguidores
0
Artículos
263
Última venta
3 semanas hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes