QUESTIONS WITH ANSWERS
◉Installation of EVSE at an existing building. Answer: is worth as
many as 15 LEED points.
◉Installing electric vehicle charging equipment. Answer: may
improve public perception of a business.
◉When a business installs charging equipment. Answer: the public
may sense that the business supports sustainability.
◉Determining the appropriate location for EVSE. Answer: requires
the person planning the installation to consider all of the above.
◉Proper location of EVSE. Answer: may include consideration of
ADA guidelines depending on location.
◉Jurisdictional codes and requirements. Answer: should always be
checked when determining the location and other features of the
EVSE.
,◉Bollards, curbs, and wheel stops. Answer: can protect charging
equipment from physical damage from vehicles.
◉Adequate site lighting. Answer: increases the safety of an EVSE
location.
◉Trailblazing signs. Answer: are for directing drivers to the location
of EV charging equipment.
◉According to the ADA guidelines. Answer: 4% of general parking
spaces should be accessible.
◉ADA parking space guidelines. Answer: can be used as a guide
when determining the number of EV charging spaces that should be
made accessible.
◉ADA guidelines. Answer: are useful when planning an EVSE
installation because all of the above.
◉Operable parts of accessible equipment. Answer: should be
located 15"-48" above finish grade per ADA guidelines.
◉The maximum depth of a barrier. Answer: such as a curb or
housekeeping pad, in front of accessible equipment is 10".
, ◉DC fast chargers. Answer: pose accessibility challenges because
their cables and connectors are larger and heavier than standard
Level 1 and Level 2 EVSE.
◉Benefits of commissioning the installation of electric vehicle
supply equipment (EVSE). Answer: include all of the above.
◉commissioning. Answer: is the process that ensures mechanical,
electrical, and other building systems are installed, tested, and
perform interactively in accordance with design documents.
◉test EVSE ground fault response. Answer: One of the tests
performed by an EVSE test set.
◉Documentation. Answer: transfers important information about
an installation from the contractor to the owner.
◉true. Answer: A statement indicating that the documentation
transfer is important.
◉customer. Answer: A key component of commissioning fleet EVSE
is to ensure that the customer understands how to manage the
software.