Where must the operator's manual be kept during crane operations? Ans: The operator's manual should always be kept in the cab according to ASME B30.5, what are the minimal requirements to meet the crane operator qualifications? Ans: Physical, Written test, Practical Test which will have the greatest effect to the fulcrum of a crawler crane and have a major impact on capacity? Ans: working over the rear what hand signal must always be obeyed? Ans: Stop When removing pins or bolts from a boom, assembly, workers shall remain? Ans: out from under the boom All rights reserved © 2025/ 2026 | Page | 2 when may a crane be overloaded? Ans: Never

Vista previa del contenido

Page |1


certified mobile crane operator prep test
Questions and Correct Answers/ Latest
Update / Already Graded
Where must the operator's manual be kept during crane operations?

Ans: The operator's manual should always be kept in t he cab


according to ASME B30.5, what are the minimal requirements to meet
the crane operator qualifications?

Ans: Physical, Written test, Practical Test


which will have the greatest effect to the fulcrum of a crawler crane
and have a major impact on capacity?

Ans: working over the rear


what hand signal must always be obeyed?

Ans: Stop


When removing pins or bolts from a boom, assembly, workers shall
remain?

Ans: out from under the boom

All rights reserved © 2025/ 2026 |

, Page |2



when may a crane be overloaded?

Ans: Never


what is the purpose of a boom length indicator?

Ans: to provide the actual boom length at the time of use.


when can the operator leave the crane?

Ans: after securing the crane


when can a crane be side loaded

Ans: with a freely suspened load


the deflection of a boom will cause the load to?

Ans: increase the radius


which inspection has a competent person making records of the
inspection?

Ans: Month


All rights reserved © 2025/ 2026 |

, Page |3



when should tag lines be used?

Ans: when the rotation of the suspended load becomes
hazardous


what shall be in the operator's cab during crane operations?

Ans: load charts


which of the following is considered duty-cycle work?

Ans: clamshell digging.


when doing the duty cycle work, most manufactures require the
crane's capacity to be reduced by?

Ans: 20%


which components are not parts of the boom?

Ans: Heel pins


the boom angle on a lattice boom crane, is the angle between?



All rights reserved © 2025/ 2026 |

Información del documento

Subido en
22 de febrero de 2026
Número de páginas
28
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$14.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Exampromax
5.0
(1)
Vendido
5
Seguidores
0
Artículos
1135
Última venta
2 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes