• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 7 páginas
Examen

Iosh Managing Safely Course Module 2.Docx

Document preview thumbnail
Vista previa 2 fuera de 7 páginas

IOSH MANAGING SAFELY COURSE MODULE

Vista previa del contenido

IOSH MANAGING SAFELY COURSE
MODULE 2 (UPDATE
2026)QUESTIONS AND ANSWERS
WITH VERIFIED SOLUTIONS 100%
CORRECT

What are the ratings for severity of harm? - CORRECT ANSWES -- Insignificant - no
injury (1)
Minor - minor injuries needing first aid (2)
Moderate - up to 3 days absence (3)
Major - more than 7 days absence (4)
Catastrophic - death (5)

What is step 3 for carrying out a risk assessment? - CORRECT ANSWES -- Evaluate
the risks and decide on precautions
The risk matrix suggests what action should be taken for each level of risk

What actions should be taken for a risk level 1-2? - CORRECT ANSWES -- no further
action is necessary, ensure controls are maintained and reviewed

What actions should be taken for a risk level 3-6? - CORRECT ANSWES -- look to
improve at the next review, or if there is a significant change

What actions should be taken for a risk level 8-12? - CORRECT ANSWES -- improve
within a specified timescale

What actions should be taken for a risk level 15-16? - CORRECT ANSWES -- take
immediate action to stop the activity, if necessary, maintain the existing controls
vigorously

What actions should be taken for a risk level 20-25? - CORRECT ANSWES -- take
immediate action to stop the activity

What should you do once control measure have been implemented? - CORRECT
ANSWES -- re-evaluate + re-estimate the risk to establish the residual risk that remains

, What is step 4 of carrying out a risk assessment? - CORRECT ANSWES -- Record the
significant findings + implement them
This is a legal requirement if an employer employs 5 or more people

What information should be recorded on a risk assessment? - CORRECT ANSWES -- -
the location, activity, equipment + materials being assessed
- the hazards identified and level of risk they present
- details of any existing control measures already in place + any additional measures
that may be needed
- the name(s) of the person(s) that completed the RA
- the date + time RA was completed
- the date a review is required

What is step 5 of carrying out a risk assessment? - CORRECT ANSWES -- Review and
update as necessary
Every company policy will determine a mandatory length of time before a review is
required, or there may be other reasons a review is required

What changes would require a risk assessment to be reviwed? - CORRECT ANSWES
-- - when new legislation is brought in, or existing legislation is updated =
- after new Approved Code of Practice is introduced, or current ACoP is updated,
- after an incident
- after new equipment is purchased
- after new operating procedures are introduced
- on discovering a person's medical circumstances have changed

How can risk assessments be improved? - CORRECT ANSWES -- - involving members
of the team that actually carry out the activities being assessed
- making sure that risk assessments are specific to the workplace
- providing colleagues with training so they can carry out 'on-the-spot risk assessments

What are some important points to remember when completing a RA? - CORRECT
ANSWES -- - make sure they remain suitable and sufficient
- better data helps make better judgments
- involve the people who are affected by the RA
- conditions may vary from site to site
- consider 'dynamic' risk assessments

What is the 2nd of 3 steps to identify a hazard? - CORRECT ANSWES -- Assess
activities being carried out, consider various types of people that can be harmed

What is the 3rd of 3 steps to identify a hazard? - CORRECT ANSWES -- Assess the
equipment + substances used at each locationWhat is a hazard? - CORRECT
ANSWES -- Something that has the potential to cause harm


What is a risk? - CORRECT ANSWES -- The probability that a hazard will cause harm

Información del documento

Subido en
10 de febrero de 2026
Número de páginas
7
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$18.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
1
Seguidores
0
Artículos
663
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes