• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

Afsb 152 Practice Script Updated 2026 Tested Solutions

Document preview thumbnail
Preview 3 out of 19 pages

AFSB 152 PRACTICE SCRIPT UPDATED 2026 TESTED SOLUTIONS

Content preview

AFSB 152 PRACTICE SCRIPT UPDATED 2026
TESTED SOLUTIONS

⫸ Surety. Answer: The party (usually an insurer) to a surety bond that
guarantees to the oblige that the principal will fulfill an obligation or
perform as required by the underlying contract, permit, or law.


⫸ Obligee. Answer: The party to a surety bond that receives the surety's
guarantee that the principal will fulfill an obligation or perform as
promised.


⫸ Principal. Answer: The party to a surety bond whose obligation or
performance the surety guarantees.


⫸ Suretyship. Answer: The obligation of one entity to answer for the
debt, default, or miscarriage of performance of duties by another entity.


⫸ Contract bond. Answer: A surety bond guaranteeing the fulfillment of
obligations under construction contracts or other types of contracts.


⫸ Bid bond. Answer: A contract bond guaranteeing that a contractor
bidding on a construction or supply contract will enter into the contract
and will provide a performance bond if the bid is accepted.

,⫸ Design/build. Answer: A construction method that offers "one-stop
shopping" to design and construction services.


⫸ Construction mortgage. Answer: A loan that provides financing
during the construction period.


The owner usually pays interest on the funds borrowed but makes no
principal payment.


⫸ Permanent mortgage. Answer: A loan that provides financing after
construction is complete.


Payments to the lender include both interest and principal, and the
mortgage is expected to be in effect for a number of years.


⫸ Subcontractor (specialty contractor). Answer: An independent
contractor who specializes in a particular kind of work and who is
engaged by a general contractor to perform a particular portion of the
general contractor's contract.


⫸ Mobilization. Answer: The process before the construction begins
that involves initial activities to facilitate a construction process, such as
moving equipment and a field office onto the job site and installing
temporary utilities.

, ⫸ Critical path method (CPM). Answer: A process that identifies every
major element of the construction project, as well as a time estimate for
each element, and assembles these elements into one master schedule.


⫸ Punch list. Answer: A list of small finishing tasks that must be
accomplished for completion.


⫸ General building contractor. Answer: An independent contractor who
obtains the primary contract for a project and either completes all the
work or subcontracts portions (or all) of the work to other independent
contractors who specialize in such work.


⫸ General engineering Contractor. Answer: A contractor that constructs
locks and dams, power plants, large bridges, sewage and water treatment
plants, or similar projects for public and private owners.


⫸ Heavy and highway construction. Answer: A type of construction
used for highways, bridges, dams, roads, railroad beds, and similar
projects.


⫸ Material Supplier. Answer: Manufacturer or distributor that sells
materials and equipment.


⫸ Change order. Answer: The written consent form the architect and
owner that modifies the construction contract in price and substance.

Document information

Uploaded on
February 3, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.1
(14)
Sold
205
Followers
1
Items
66808
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions