3b2 Test With All Correct Answers
d - Ans--In a preventive maintenance system, 'mechanical work' includes:1.
Inspecting.2. Adjusting.3. Preparing work orders.4. Parts inventory
control.5. Lubricating.
Select one:
a. 1, 2, 3
b. 2, 3, 4
c. 3, 4, 5
d. 1, 2, 5
e. 2, 4, 5
b - Ans--Written communication includes:1. Letters.2. Memos.3. Posters.4.
Procedure manuals.5. Charts.
Select one:
a. 1, 2, 3, 4, 5
b. 1, 2, 4
c. 2, 3, 4
d. 1, 3, 5
e. 2, 4, 5
b - Ans--If a project plan gets off schedule the Planner may have to:1. Check
to see that the plan is being followed.2. Remove non-critical items from the
plan.3. Schedule overtime work.4. Re-schedule certain events.
Select one:
a. 1, 2, 3
b. 1, 2, 3, 4
c. 1, 3, 4
d. 2, 3, 4
e. 1, 2, 4
a - Ans--The limitation of a Gantt chart as a planning technique is that it:
Select one:
a. Does not foresee delays or trouble.
b. Can not cover enough basic information.
c. Is only good for very small planning jobs.
,d. Is very hard to follow.
e. Cannot be used to indicate actual work completed.
e - Ans--The purpose of a project review is to:1. Gain experience.2.
Recommend changes for the next time.3. Inform other people of various
problems.4. Make a report as part of the continuous planning program.
Select one:
a. 1, 2
b. 2, 3
c. 1, 3, 4
d. 2, 3, 4
e. 1, 2, 3, 4
e - Ans--At a power plant the term "preventive maintenance" involves the
following actions:1. Repairing deficiencies.2. Reporting deficiencies.3.
Scheduling maintenance inspections.4. Recording repairs performed.
Select one:
a. 2, 4
b. 1, 2, 3
c. 2, 3, 4
d. 1, 3, 4
e. 1, 2, 3, 4
a - Ans--The Operations log book in a power plant is:
Select one:
a. A legal document.
b. Not available to the Boiler Inspector.
c. Not used as evidence in inquiries.
d. Not used to record operating temperatures and pressures.
e. Used to record absenteeism.
a - Ans--The authority that makes the keeping of the log book mandatory is
the:
Select one:
a. Boilers Act.
b. Industry Trade Union.
c. Plant or Chief Engineer.
d. Institute of Power Engineers.
, e. Workers Compensation Board.
a - Ans--Maintenance issues that must be scheduled may be initiated by:1.
Operations shift supervisor inspections2. Maintenance technicians3.
Operator observations4. Maintenance Foreman
Select one:
a. 1, 2, 3, 4
b. 1, 2, 3
c. 1, 3, 4
d. 1, 2
e. 3, 4
a - Ans--Areas of maintenance that must be scheduled can be located by:
Foreman or shift supervisor inspections
Regular observation by the operators
Government inspections
Insurance inspections
Select one:
a. 1, 2, 3, 4
b. 1, 2, 3
c. 1, 3, 4
d. 1, 2
e. 3, 4
c - Ans--Environmental management program involves protection of the
environment and _____ awareness.
Select one:
a. Private.
b. Individual.
c. Public.
d. Government.
e. Industrial.
e - Ans--With respect to record keeping, the Provincial Boiler and Pressure
Vessels Act and Regulations require that::1. A log book is kept in all plants.2.
The log book must be available to the inspector and is a legal document.3.
Boiler registration and inspection certificates be kept in a safe place.4. The
Chief Inspector be kept informed of all accidents and casualties.
d - Ans--In a preventive maintenance system, 'mechanical work' includes:1.
Inspecting.2. Adjusting.3. Preparing work orders.4. Parts inventory
control.5. Lubricating.
Select one:
a. 1, 2, 3
b. 2, 3, 4
c. 3, 4, 5
d. 1, 2, 5
e. 2, 4, 5
b - Ans--Written communication includes:1. Letters.2. Memos.3. Posters.4.
Procedure manuals.5. Charts.
Select one:
a. 1, 2, 3, 4, 5
b. 1, 2, 4
c. 2, 3, 4
d. 1, 3, 5
e. 2, 4, 5
b - Ans--If a project plan gets off schedule the Planner may have to:1. Check
to see that the plan is being followed.2. Remove non-critical items from the
plan.3. Schedule overtime work.4. Re-schedule certain events.
Select one:
a. 1, 2, 3
b. 1, 2, 3, 4
c. 1, 3, 4
d. 2, 3, 4
e. 1, 2, 4
a - Ans--The limitation of a Gantt chart as a planning technique is that it:
Select one:
a. Does not foresee delays or trouble.
b. Can not cover enough basic information.
c. Is only good for very small planning jobs.
,d. Is very hard to follow.
e. Cannot be used to indicate actual work completed.
e - Ans--The purpose of a project review is to:1. Gain experience.2.
Recommend changes for the next time.3. Inform other people of various
problems.4. Make a report as part of the continuous planning program.
Select one:
a. 1, 2
b. 2, 3
c. 1, 3, 4
d. 2, 3, 4
e. 1, 2, 3, 4
e - Ans--At a power plant the term "preventive maintenance" involves the
following actions:1. Repairing deficiencies.2. Reporting deficiencies.3.
Scheduling maintenance inspections.4. Recording repairs performed.
Select one:
a. 2, 4
b. 1, 2, 3
c. 2, 3, 4
d. 1, 3, 4
e. 1, 2, 3, 4
a - Ans--The Operations log book in a power plant is:
Select one:
a. A legal document.
b. Not available to the Boiler Inspector.
c. Not used as evidence in inquiries.
d. Not used to record operating temperatures and pressures.
e. Used to record absenteeism.
a - Ans--The authority that makes the keeping of the log book mandatory is
the:
Select one:
a. Boilers Act.
b. Industry Trade Union.
c. Plant or Chief Engineer.
d. Institute of Power Engineers.
, e. Workers Compensation Board.
a - Ans--Maintenance issues that must be scheduled may be initiated by:1.
Operations shift supervisor inspections2. Maintenance technicians3.
Operator observations4. Maintenance Foreman
Select one:
a. 1, 2, 3, 4
b. 1, 2, 3
c. 1, 3, 4
d. 1, 2
e. 3, 4
a - Ans--Areas of maintenance that must be scheduled can be located by:
Foreman or shift supervisor inspections
Regular observation by the operators
Government inspections
Insurance inspections
Select one:
a. 1, 2, 3, 4
b. 1, 2, 3
c. 1, 3, 4
d. 1, 2
e. 3, 4
c - Ans--Environmental management program involves protection of the
environment and _____ awareness.
Select one:
a. Private.
b. Individual.
c. Public.
d. Government.
e. Industrial.
e - Ans--With respect to record keeping, the Provincial Boiler and Pressure
Vessels Act and Regulations require that::1. A log book is kept in all plants.2.
The log book must be available to the inspector and is a legal document.3.
Boiler registration and inspection certificates be kept in a safe place.4. The
Chief Inspector be kept informed of all accidents and casualties.