Newest 2026-2027 Exam With Complete Questions
And 100%Correct Detailed Answers| Just Released
What is the application rate for ARMI layers? - ANSWER-
0.6 - 0.8 gal/syd Use the AC(ARB) temperature correction
factor
What is the spread rate for the chip spreader? – ANSWER
0.26 to 0.33ft/syd with the actual spread rate determined
by the engingeer
What is the minimum thickness for asphalt being placed
over an ARMI layer? - ANSWER-1 1/2 inches unless plans
call for a thicker mat
Where should you stick a thermometer in a truck? -
,ANSWER-The hole should be 1/4 of an inch In the middle
third of the length of the body and 6 to 10 inches above
the bottom of the bed
How much asphalt should be in front of the screed being
mixed by the augers? - ANSWER-The proper head of
material is at the center of the auger shaft
, While the paver is moving the augers should be moving -
ANSWER-80 -90 % of the time
Screed heaters can not be used to do what - ANSWER-
raise the heat of the mix
When matching paved joints you must have a - ANSWER-
Joint matcher (sonic or shoe paddles)
, The ski pole for the join matcher has to be how long -
ANSWER-25ft
Longitudinal (horizontal when facing down the road) joint
should always be staggered how far apart - ANSWER-6 to
12 inches
While paving an unsupported edge the edge can no
deviate more than how far from the string line? -
ANSWER-+/- 1.5"
Tapers are required on joints when the adjacent travel
lanes has a difference in elevation - ANSWER-greater
than 1 1/2