100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

RTPM LATEST 2026 STUDY GUIDE QUESTIONS AND ANSWERS GRADED A+

Puntuación
-
Vendido
-
Páginas
9
Grado
A+
Subido en
09-01-2026
Escrito en
2025/2026

RTPM LATEST 2026 STUDY GUIDE QUESTIONS AND ANSWERS GRADED A+

Institución
Rtpm
Grado
Rtpm









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Rtpm
Grado
Rtpm

Información del documento

Subido en
9 de enero de 2026
Número de páginas
9
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

RTPM LATEST 2026 STUDY GUIDE QUESTIONS AND
ANSWERS GRADED A+
✔✔150. What must provide the means of determining that the work is being performed
properly? - ✔✔the SOW

✔✔151. True or False: The SoW should specify the number of copies of reports and the
person to whom they will be delivered. - ✔✔true

✔✔152. True or False: The SoW should specify any physical arrangements necessary
to assure the owner's capability to examine end products. - ✔✔true

✔✔153. When can safety be excluded from the scope? - ✔✔When the project only has
the PM issuing the design documentation only

✔✔154. When will safety be an area of greatest risk to the project? - ✔✔Construction

✔✔155. The purpose of ___________________ is to determine potential risk events
and their characteristics that, should they occur, may have an impact on the project. -
✔✔risk management

✔✔156. What are events or circumstances that affect the original plan or scope of the
project? - ✔✔risk

✔✔157. What are events or circumstances that adversely affect the success of the
project? - ✔✔liability

✔✔158. When do risks become liabilities? - ✔✔when they are not effectively managed

✔✔159. What are the two primary risk components - ✔✔probability of occurrence of that
event & impact of that event occurring

✔✔160. What is the process of identifying and classifying risks for the purposes of
developing strategies and controls to effectively prevent or mitigate risks? - ✔✔risk
assessment

✔✔161. How can PMs begin the risk management plan process? - ✔✔Identification,
analysis, mitigation

✔✔162. What are events or performance characteristics that warn of the occurrence of
risk events? - ✔✔risk triggers

✔✔163. List two ways to identify risk? - ✔✔qualitative and quantitative

, ✔✔164. What determines the potential of each identified risk to become a liability to the
project and identifies any dependencies that exist between risks? - ✔✔risk analysis

✔✔165. What type of risk analysis qualifies the expected impact of cost, timeframe, and
quality of a risk? - ✔✔qualitative risk

✔✔166. What type of risk analysis involves measuring the probability and impact of
each risk? - ✔✔quantitative risk

✔✔167. Impact can be assessed in terms of its effect on which four areas? - ✔✔Time,
cost, quality, risk proximity

✔✔168. What involves identifying the strategy for minimizing the effects of the risk to a
level where the risk can be controlled and managed to ensure that the project objectives
are achieved? - ✔✔risk mitigation

✔✔169. List 5 risk mitigation strategies. - ✔✔avoidance, transference, sharing,
moderation, acceptance

✔✔170. What is one way to avoid risk? - ✔✔Add an assumption or exclusion in the
SOW

✔✔171. Risk control forms have 9 fields which are: - ✔✔unique ID, description,
probability, impact, timescale, cost, owner, response, early warning signs

✔✔172. How does an OBS (organization breakdown structure) differ from a traditional
organizational chart? - ✔✔It covers everyone involved regardless of the company or
organization

✔✔173. The WBS must cover all of the elements of the project including: _______,
________, and ________. - ✔✔planning, implementing and closing out the project

✔✔174. True or False: The WBS should be as specific as possible. - ✔✔True

✔✔175. What uses network diagrams to identify predecessor and successor
relationships on projects? - ✔✔PERT

✔✔176. What uses a network diagram by identifying the chain of events that take the
longest time to complete on the project? - ✔✔CPM

✔✔177. List the four network diagram dependencies. - ✔✔finish-start (Task A can't start
til task B is finished), finish-finish , start-start, start-finish
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BOARDWALK Havard School
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
182
Miembro desde
1 año
Número de seguidores
7
Documentos
24136
Última venta
4 días hace
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.7

33 reseñas

5
14
4
6
3
7
2
0
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes