LEED Green Associate Exam Professional
Level Practice Test UPDATED Study Guide
QUESTIONS AND CORRECT ANSWERS
- Precertification and Recertification are two certification types that
are different than the conventional LEED Certification process.
Which of the following statements is true? - CORRECT ANSWERS
Recertification is applicable to LEED for Operations and
Maintenance while Precertification is applicable to LEED Core and
Shell
What are the main variables that affect indoor environmental quality?
- CORRECT ANSWERS Acoustics, Indoor air quality,
Thermal comfort, and Controlling systems
All of the following are topics addressed under materials and
resources credit category, except: - CORRECT ANSWERS
Design for adaptability and flexibility
A process performed prior to occupancy and after construction works
are completed to ensure clean indoor air quality through exhausting
old air and replacing it with outdoor fresh air. - CORRECT
ANSWERS Flush-out
USGBC chapters can be found in most of the states around USA,
which of the following statements about USGBC chapter is true? -
CORRECT ANSWERS Chapters provide local green building
resources, education, and leadership opportunities
, Tradable renewable certificates which represent the environmental
attributes associated with the power produced from renewable energy
projects and are sold separately from commodity electricity. -
CORRECT ANSWERS REC
A developer registered his project and paid the fees for LEED gold
certification level. What will the project receive next? - CORRECT
ANSWERS Access to LEED online project page
In a new commercial building, tenants want to keep their
conservations as private as possible. Which of the following strategies
will ensure that? - CORRECT ANSWERS Providing sound
barriers
Project team is considering using black water in irrigation. What is
true about this scenario? - CORRECT ANSWERS Black water
can't be used in irrigation
Which of the following is a brownfield site? - CORRECT ANSWERS
A land with an existing abandoned factory that was producing
lead in the past.
Project team decided to ventilate the building through a hybrid system
"Mechanically and Naturally". Which of the following credit
categories will be impacted by the most? - CORRECT ANSWERS
Energy and Atmosphere and Indoor Environmental Quality
Where can the project team purchase RECs? - CORRECT
ANSWERS Anywhere
Level Practice Test UPDATED Study Guide
QUESTIONS AND CORRECT ANSWERS
- Precertification and Recertification are two certification types that
are different than the conventional LEED Certification process.
Which of the following statements is true? - CORRECT ANSWERS
Recertification is applicable to LEED for Operations and
Maintenance while Precertification is applicable to LEED Core and
Shell
What are the main variables that affect indoor environmental quality?
- CORRECT ANSWERS Acoustics, Indoor air quality,
Thermal comfort, and Controlling systems
All of the following are topics addressed under materials and
resources credit category, except: - CORRECT ANSWERS
Design for adaptability and flexibility
A process performed prior to occupancy and after construction works
are completed to ensure clean indoor air quality through exhausting
old air and replacing it with outdoor fresh air. - CORRECT
ANSWERS Flush-out
USGBC chapters can be found in most of the states around USA,
which of the following statements about USGBC chapter is true? -
CORRECT ANSWERS Chapters provide local green building
resources, education, and leadership opportunities
, Tradable renewable certificates which represent the environmental
attributes associated with the power produced from renewable energy
projects and are sold separately from commodity electricity. -
CORRECT ANSWERS REC
A developer registered his project and paid the fees for LEED gold
certification level. What will the project receive next? - CORRECT
ANSWERS Access to LEED online project page
In a new commercial building, tenants want to keep their
conservations as private as possible. Which of the following strategies
will ensure that? - CORRECT ANSWERS Providing sound
barriers
Project team is considering using black water in irrigation. What is
true about this scenario? - CORRECT ANSWERS Black water
can't be used in irrigation
Which of the following is a brownfield site? - CORRECT ANSWERS
A land with an existing abandoned factory that was producing
lead in the past.
Project team decided to ventilate the building through a hybrid system
"Mechanically and Naturally". Which of the following credit
categories will be impacted by the most? - CORRECT ANSWERS
Energy and Atmosphere and Indoor Environmental Quality
Where can the project team purchase RECs? - CORRECT
ANSWERS Anywhere