100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

2026 NICET Highway Construction Inspector Level iii Practice Test Update Correctly Answered Graded Pass

Puntuación
-
Vendido
-
Páginas
14
Grado
A+
Subido en
08-01-2026
Escrito en
2025/2026

2026 NICET Highway Construction Inspector Level iii Practice Test Update Correctly Answered Graded Pass

Institución
NICET Highway Construction Inspector Level Iii
Grado
NICET Highway Construction Inspector Level iii









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NICET Highway Construction Inspector Level iii
Grado
NICET Highway Construction Inspector Level iii

Información del documento

Subido en
8 de enero de 2026
Número de páginas
14
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

2026 NICET Highway Construction Inspector
Level iii Practice Test Update Correctly
Answered Graded Pass
A failed sloped is regraded to help stabilize the slope. What is the main purpose of the regrading?

a) add fill at the top of the slope
b) reduce concentrated flow
c) remove soil at the top of the slope
d) remove vegetation

b) reduce concentrated flow

When can pre-stressed concrete beams be transported to the jobsite?

a) after concrete has attained the minimum required design strength and is at least 7 days old
b) after concrete has attained the minimum required design strength and is at least 14 days old
c) after concrete has attained the minimum required design strength and is at least 21 days old
d) after concrete has attained the minimum required design strength and is at least 28 days old

a) after concrete has attained the minimum required design strength and is at least 7 days old

How soon after installation may anchor rods be subjected to service loads?

a) when concrete reaches 14-day specified strength
b) when concrete reaches 28-day specified strength
c) when concrete reaches 50% of its 28-day specified strength
d) when concrete reaches 75% of its 28-day specified strength

b) when concrete reaches 28-day specified strength

The invert of the sewer drops 1.2 feet in a horizontal distance of 250 feet. What is the slope?

a) 0.0048%
b) 0.040%
c) 0.40%
d) 0.48%

d) 0.48%

, Driven falsework piles shall be removed if they are less than how many inches below subgrade with a
roadbed?

a) 11 inches
b) 15 inches
c) 24 inches
d) 28 inches

a) 11 inches

The contractor proposes to place concrete for a drilled shaft per the dry method. Prior to concrete
placement, the contractor attempts to pump out any water from the drilled shaft but has an inflow of
groundwater at a rate greater than 12 inches per hour. Which of the following is the proper procedure
under this circumstance?

a) add additional cement to concrete mix to maintain the proposed water-cement ratio.
b) Continue pumping out ground water in shaft during concrete placement.
c) Drill shaft deeper to accommodate the excess groundwater and place concrete.
d) Flood shaft and place concrete per wet method.

d) Flood shaft and place concrete per wet method.



During installation of traffic loops in the pavement, which three statements apply prior to and during
the installation of loop wire? (Choose 3).

a) Do not allow vehicular traffic over an open saw cut.
b) Do not overlap saw cuts at the corner.
c) Thoroughly clean the saw cut of foreign material.
d) Use a plastic sleeve where loop wire crosses a joint.

a) Do not allow vehicular traffic over an open saw cut.
c) Thoroughly clean the saw cut of foreign material.
d) Use a plastic sleeve where loop wire crosses a joint.

What are three possible acceptance methods for PVC pipeline used for sewers? (Choose 3)

a) bacteria
b) deflection
c) leakage
d) visual inspection

b) deflection
c) leakage
d) visual inspection
$24.50
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NURSMERIT West Coast University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1439
Miembro desde
3 año
Número de seguidores
760
Documentos
2878
Última venta
1 semana hace
NURSMERIT

Let’s make academic success your reality

4.1

336 reseñas

5
182
4
76
3
32
2
11
1
35

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes