100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

General Contractor (Commercial) Certification QUESTION AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A INSTANT DOWNLOAD PDF

Puntuación
-
Vendido
-
Páginas
36
Grado
A+
Subido en
07-01-2026
Escrito en
2025/2026

General Contractor (Commercial) Certification QUESTION AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A INSTANT DOWNLOAD PDF

Institución
General Contractor Certification
Grado
General Contractor Certification











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
General Contractor Certification
Grado
General Contractor Certification

Información del documento

Subido en
7 de enero de 2026
Número de páginas
36
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

General Contractor (Commercial)
Certification QUESTION AND CORRECT
ANSWERS (VERIFIED ANSWERS) PLUS
RATIONALES 2026 Q&A INSTANT
DOWNLOAD PDF

1. What is the primary purpose of a general contractor on a
commercial construction project?
A. To provide labor only
B. To manage and coordinate all aspects of construction
C. To design the building
D. To inspect electrical systems
Answer: B. To manage and coordinate all aspects of construction
Rationale: The general contractor oversees the entire construction
process, including subcontractors, schedules, budgets, and compliance
with codes.


2. Which document outlines the responsibilities of the owner,
contractor, and architect?
A. Construction schedule
B. Contract agreement
C. Building permit
D. Material specifications

,Answer: B. Contract agreement
Rationale: The contract agreement legally defines roles, responsibilities,
and obligations of all parties involved in the project.


3. What is the typical role of a subcontractor in commercial
construction?
A. Approve project financing
B. Perform specialized work under the general contractor
C. Oversee the entire construction project
D. Issue permits
Answer: B. Perform specialized work under the general contractor
Rationale: Subcontractors are hired for specific trades such as
plumbing, electrical, or HVAC under the management of the general
contractor.


4. Which of the following is a key component of a construction
schedule?
A. Payment terms
B. Milestones and deadlines
C. Material color options
D. Warranty duration
Answer: B. Milestones and deadlines
Rationale: Construction schedules outline start and finish dates for
project phases, critical for timely completion.

,5. What type of insurance is essential for a general contractor to
protect against job site injuries?
A. Life insurance
B. Workers’ compensation insurance
C. Vehicle insurance
D. Health insurance
Answer: B. Workers’ compensation insurance
Rationale: Workers’ compensation protects employees in case of injuries
sustained while working on the construction site.


6. What does the term “retainage” refer to in construction contracts?
A. Profit margin
B. Portion of payment withheld until project completion
C. Insurance premium
D. Overhead costs
Answer: B. Portion of payment withheld until project completion
Rationale: Retainage ensures the contractor completes the work
satisfactorily before receiving full payment.


7. When is a punch list typically created?
A. Before construction begins
B. During the design phase
C. Near the end of construction
D. After warranty period

, Answer: C. Near the end of construction
Rationale: A punch list identifies incomplete or deficient work to be
corrected before final project acceptance.


8. What is the purpose of a building permit?
A. To authorize demolition only
B. To ensure construction complies with local codes
C. To order materials
D. To hire subcontractors
Answer: B. To ensure construction complies with local codes
Rationale: Building permits verify that construction meets safety,
structural, and zoning regulations.


9. Which type of contract pays the contractor a fixed amount
regardless of actual costs?
A. Cost-plus contract
B. Lump-sum contract
C. Time and materials contract
D. Unit-price contract
Answer: B. Lump-sum contract
Rationale: A lump-sum contract sets a fixed total price, placing the risk
of cost overruns on the contractor.


10. What is the main purpose of construction site safety meetings?
A. To train subcontractors on scheduling
$23.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
mrpass

Conoce al vendedor

Seller avatar
mrpass Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
Nuevo en Stuvia
Miembro desde
1 mes
Número de seguidores
0
Documentos
804
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes